Instrukcja obsługi AstralPool ECA 650


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla AstralPool ECA 650 (8 stron) w kategorii Filtr wody. Ta instrukcja była pomocna dla 2 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/8
INSTALLATION AND
OPERATING INSTRUCTIO NS
A SERIES FILTER C SERIES FILTER EC A
www.astralpool.com.au
sales@astralpool.com.au
INSTALLATION AND OPERATING INSTRUCTIONS I INSTALLATION AND OPERATING INSTRUCTIONS
CA , A,Series EC
MEDIA Filters
Inst.3 CA ECA MEDIA FILTER V06- 68 20
2
CA SERIES MEDIA FILTERS
ECA SERIES MEDIA FILTERS
INFORMATION AND SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE.
GENERAL NOTES
1. When unpacking the lter, be sure the unit is complete and no visible shipping damage has occurred.
2. Allow sucient clearance around lter system for access and maintenance.
3. Provide adequate ventilation for pumping equipment, installed in conjunction with lter.
4. Provide solid mounting for lter and pump. If installed outdoors, install the system on a slab or solid concrete base
to avoid risk of settlement. Filter systems once located with sand and water can exceed a weight of 250 kg. If
installed indoors, ensure doorway allows sucient clearance should lter tank require replacing.
5. Installation of lters and pumps should be located as close to the pool as possible to avoid excessive piping friction
loss.
6. If system is installed below pool level it is important to install isolating valves to prevent risk of ooding from back
up water, from the pool or spa.
7. The proper sand selection is critical to good lter performance. Ensure that the media is an approved form of
Quartz Silica sand, glass or Zeolite.
8. The installation of lters requires no special tools.
9. Conrm that plumbing lines from pool are correctly identied. This will ensure proper connection to markings on
lter valve (i.e. “Pump”, “Waste”, and “Return”).
Model
No.
Tank
Diameter
Filter Area
6 Hr.
Turnover
8 Hr.
Turnover
Sand Req’d.
VIRON ACTIVE VIRON ACTIVE
COURSE FINE
CA280
CA300
CA340
CA400
6 65 mm
665 mm
742 mm
816 mm
0.30 Sq M
0.30 Sq M
0.38 Sq M
0.46 sq M
100,800 l trs
108,000 lts
115,200 ltrs
144,000 ltrs
134,400 ltrs
144,000 lts
153,600 trs
192,000 l trs
120 kg
120 kg
1 50 kg
2 00 kg
45 kg 75kg
45 kg 75 kg
60 kg 90kg
75 kg 125kg
Dimensions With Valve Installed
Model
Height
Width
Shipping Weight
CA280
CA300
CA 340
CA400
106 cm
107.6 cm
107.6 cm
123.3 cm
66.5 cm
66.5cm
74.2 cm
81.6 cm
20 kg
21 kg
22 kg
28 kg
Model
No.
Tank
Diameter
Filter Area
Port
Size
6 Hr.
Turnover
8 Hr.
Turnover
VIRON
ACTIVE
COURSE
VIRON
ACTIVE
FINE
Sand Req’d
ECA 550
ECA6 50
5 86 mm
6 65 mm
0.23 Sq M
0.30 Sq M
40 mm
40 mm
65,000 ltrs
92,000 ltrs
85,000 ltrs
120,000 ltrs
30 kg
45kg
50kg
75kg
80 kg
120 kg
Dimensions With Valve Installed
Model
Height
Width
Shipping Weight
E CA 550
E 650 CA
98 cm
105 cm
58.6 cm
66.5 cm
13 kg
17 kg
Inst.3 CA ECA MEDIA FILTER V06- 68 20
3
LOADING FILTER SAND
Once the lter system has been positioned, the installation of lter sand may be undertaken as follows:
1. Check lter size in order to determine necessary amount of sand required.
2. Double check that the internal system consisting of a lateral hub and stand pipe are intact inside the tank.
3. Fill tank half full with water.
4. Place the disposable loading disc into the upper tank opening and the plastic cover over stand pipe to stabilise the
lter and stand pipe. It is important that the stand pipe remains centered through the sand loading procedure to
ensure alignment with valve assembly opening.
5. Proceed to load correct volume of dry sand slowly (if sand is saturated loading can be dicult).
6. Once sand is loaded discard loading disc and check to determine if stand pipe is properly centered in tank opening.
7. Fill with sand, glass or other approved sand to the shoulder level of the lter.
INSTALLATION OF SELECTOR VALVE
1. Following the sand loading, clean any sand particles or debris from upper surface of tank opening.
2. Install six (6) position selector valve after placing in cavity on tank body. Place valve into tank opening O-Ring
while ensuring that the has remained in position. O-Ring
3. Install selector valve into top tank opening and rotate valve to best suit plumbing lines.
a. CA Series: lock ring rmly once valve positioned, tighten the by hand.
b. ECA Series: once valve positioned, t assembly around neck of lter and valve and tighten clamp band
suciently for good engagement.
c. Note: It is not necessary to over tighten.
4. Double check that incoming pool lines are connected to appropriate valve openings as marked on valve port (i.e.
pump, return (pool) and waste).
5. The threaded openings on valve are 40mm or 50mm thread which all accommodate Astral Pool barrel unions
supplied with the lter. O-rings are supplied to t between the multiport valve and barrel union. It is only
necessary to tighten by hand. THE USE OF TEFLON TAPE IS NOT REQUIRED.
6. Remove plug from side wall of valve and install threaded pressure gauge (if not already tted) using Teon tape
wrap. . Minimal hand tightening is adequate to provide a good seal. Do not over tighten
NOTE:
How to correct a liquid lled gauge that has moved off of “0 psi” during shipping?
Why it happens
Liquid lled pressure and vacuum gauges are tested for accuracy at the factory. However, during transport,
changes in temperature and altitude may cause a shift in the gauge’s internal pressure. That, in turn, causes the
gauge’s resting point to change. There are no long term side effects from these changes if the gauge is vented to
equalize that pressure.
If the gauge is placed in a location where big temperature changes are common, you may want to vent it when
major changes occur. When installing new gauges, it is a good practice to mount them with the stopper up so that
they can be vented easily
How to x it
On top of the gauge is a rubber stopper which secures the liquid lling. To calibrate a gauge that is not returning to
zero, just lift one edge of the stopper to equalize the pressure inside. Try to position the gauge so that the stopper
opening is pointed upward and any air bubble inside the pressure gauge is at the near it. After venting the gauge,
you should see the pointer move back to 0 psi, remember to keep the gauge vertical (stopper on top), so that the
oil doesn't leak out.
If a little of the liquid escapes, just wipe it away. Astralpool uses non-toxic food grade glycerin to ll its gauges.
Wiping away the excess is important however, as left over glycerin will collect dust and debris if it is not cleaned
o. Replace the stopper when nished. The gauge will work without stopper replacement, but it should be put back
in place to maintain a clear dial. An open top will allow dust and debris into the casing, which could cloud the
readout and might damage the gauge over time.


Specyfikacje produktu

Marka: AstralPool
Kategoria: Filtr wody
Model: ECA 650

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z AstralPool ECA 650, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Filtr wody AstralPool

AstralPool

AstralPool Artic Instrukcja

17 Września 2024
AstralPool

AstralPool ECA 650 Instrukcja

16 Września 2024
AstralPool

AstralPool Keops Instrukcja

15 Września 2024
AstralPool

AstralPool Ramsés Instrukcja

15 Września 2024
AstralPool

AstralPool ZX 75 Instrukcja

14 Września 2024
AstralPool

AstralPool CA400 Instrukcja

14 Września 2024
AstralPool

AstralPool XC 50 Instrukcja

14 Września 2024
AstralPool

AstralPool XC 150 Instrukcja

14 Września 2024

Instrukcje Filtr wody

Najnowsze instrukcje dla Filtr wody

Laica

Laica J35-AD Instrukcja

15 Października 2024
Laica

Laica J35-EB Instrukcja

15 Października 2024
Laica

Laica J11-AB Instrukcja

15 Października 2024
Laica

Laica J51-BC Instrukcja

15 Października 2024
GE

GE GX1S15C Instrukcja

13 Października 2024
Grohe

Grohe Red Instrukcja

11 Października 2024
Fluval

Fluval AquaClear AC30 Instrukcja

9 Października 2024
Fluval

Fluval AquaClear AC50 Instrukcja

9 Października 2024
Fluval

Fluval AquaClear AC20 Instrukcja

9 Października 2024
Fluval

Fluval AquaClear AC70 Instrukcja

9 Października 2024