Instrukcja obsługi Jindara Tilga

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Jindara Tilga (2 stron) w kategorii Podgrzewacz. Ta instrukcja była pomocna dla 2 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/2
Zero Clearance
Cabinet Installation
ZCC Part No. 232367
Sheet 1 NEXT 2 GPN 232738 Rev.*
To suit Insert Models: Pearl & Tilga
35
40
ZCC Installation notes
This a appli nce has been factorytted and att cha ed insi thde e ZCC. Depending on your desired s in tall tia on type, whe het r
i ount be grat d l level, or e eva r a midted fo -w l al installation, the following s ue seq nce of in ta lal tion steps may need to j be adusted
to suit Fo. r any additio rmnal info ation please r refe to the Ope on d rati an Ins alt lation Instruc oti ns supplied with the appl ani ce, or cont t ac
t ahe de ler from whom you purchased the he er frat om.
S cele t t itihe pos on at th you wish to in stall your rInse t ZCC, carefull owiny all g for ue clearances of 305 m im n the
roo avityf c (the outer e beiu ng 255mm req reui s a 25mm clearanc one either side to co nmbustibles, maki g over ll clea arance of
305mm), and all oowing f r su clecient arances r us fo comb tibles where rear and side walls may play a roll in the insta latl ion
process.
• Ensure there is access to a p wer so upply ins ide th ncle e osu onnre f r co ectin thg e fan in the heater. I some n insta cen s an
ex ent sion cord m iaybe requ red to re h a pac ower suppl ley. P ase keep in mind ha t t the fan will n oeed t be removed for c lea ng,ni
and access to the power s oulupply sh d be made relat asyively e .
R oem ve door (open door handle and swin oorg d open to rou hlg y 45deg and lift ohinge), re ove casm t ir n linero s and bae
system from in hside t e rebox to u red ce over l al weigh t of u . nit
• Using a 5 m am llan key, rem ve p1-x4 M8 o cap screws which at acht t che fas ia to the rebox. Carefullly remove the fascia and place
to the side. Removing fa ia asc llows the ZCC to be mountedu sh with ont fr o surf enclo e fa e foc r a sh fasciu a nish.
I nsf i talling a grt ound l o aevel ont co us blmb ti e r suroo fac ie, pl e requac red oor prote toc r under th sirede de posi oti n of t he
ZCC than ca lly lrefu ift the CC i o poZ nt sition.
Fitue system to upstands and appliance. Instal throl ugh roof a cs perue manufa tur tes ins ructio minatns, and ter e at the
r uireq ed heigh ot ab ve the roof line, t c . N e: t e baowl ot h se of the acti uve e l wil need t ando be trimmed sealed withre cem t.en
• Build your frame ouar nd the ZCC maintai g nin t le ahe c ar nces listed previously.
• Enclose the front of t mhe fra e wi mith nimu m -m 9m non combustible cement sheet, villaboard, be lis boal rd etc.
• Enclose the side e s of the fram wit rh plaste , timber, MDF etc.
In tas ll the mantle if required as per mantle c ra es lea nc on the follo awing p ge.
Note: If mantle i ds ma e out of combust aible m terial, this appliance must have i ’s ht ot air deector attached t ho t e fasica.
R ate- tach removable fascia & do or.
40 1000
835 600
765
35
Zero
Clearance
Cabinet
(ZCC)
18m ism Bell Boa ,rd
cement sheet or
eq ivu al nt ine m .
T le inrip sk
Flue
noggin
800
side studs
945
mi . n width
Hearth
550
Fo l edr e evat
in astall tion detail
or arth he r t neduc io
r r In tionefe stalla
Ins ruct ti son
Sheet 1 NEXT 2 GPN 232738 Rev.*
If desirable, a non-
combustible noggin can
be attached closer than
1000mm above the base
of the appliance.
Non-combustible
hearth
Breast plate no
thicker than 30mm
55 (appliance
to mantle upright)
250
2 petS1 petS
Plaster, timber, MDF etc.
Minimum 9mm thick
cement sheet, villaboard
or non-combustible
material on front face
of framing
Non-combustible material can
overlap clearance gap between
ZCC and frameing, and run over
the front of the ZCC. DO NOT
silicon or adhear material to ZCC
as heat expansion of ZCC will
cause cracking.
Vent (optional) - Position vent
such that access is
available to fan power
supply when vent is
removed.
Hearth depth
mm in front
of unit
Vent may be
located in the
wall of on the oor.
Zero Clearance
Cabinet Installation
ZCC Part No. 232367
To suit Insert Models: Pearl & Tilga
1500
1410
Door
Removable fascia
Mantle only
hot air deflector
M8 cap screw
• 10” Upstands
55mm 97mm
• 8” Upstand
425mm 370mm
10” 8
450mm 385mm
6 inch Flue Kit
Spigot
3rd Skin
2nd Skin
1st Skin
Heater
10” Gal Flue
8” Gal Flue
6˝ S/S Flue
4th Skin
Minimum Requirements:
Note: Some states will use dierent
size ue kits which will require the
appropriate upstande.
10” Upstand
8” Upstand
5 x 6” S/S Flue
4 x 8” Gal Flue
4 x 10” Gal Flue
Sheet 2 NEXT 2 GPN 232738 Rev.*

Specyfikacje produktu

Marka: Jindara
Kategoria: Podgrzewacz
Model: Tilga

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Jindara Tilga, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Podgrzewacz Jindara

Instrukcje Podgrzewacz

Najnowsze instrukcje dla Podgrzewacz

Jotul

Jotul F 361 Instrukcja

15 Października 2024
Adler

Adler AD 7752 Instrukcja

15 Października 2024
MSW

MSW -TTEH-3000 Instrukcja

15 Października 2024
MSW

MSW IR-DRYER2000.2 Instrukcja

15 Października 2024
MSW

MSW IR-DRYER3000.1 Instrukcja

15 Października 2024
MSW

MSW IR-DRYER2000.1 Instrukcja

15 Października 2024
MSW

MSW IR-DRYER3000.2 Instrukcja

15 Października 2024
MSW

MSW -CHEH-3300 Instrukcja

15 Października 2024
MSW

MSW -CTEH-15000 Instrukcja

15 Października 2024