Instrukcja obsługi Gamber-Johnson 7160-1368


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Gamber-Johnson 7160-1368 (2 stron) w kategorii Kołyska/stacja dokująca. Ta instrukcja była pomocna dla 5 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/2
An ISO 9001:2015 certified company
Gamber-Johnson LLC 3001 Borham Avenue ∙ Stevens Point, Wisconsin 54481
PHONE: 1-715-344-3790 FAX: 1-715-344-5209 ∙ EMAIL: gamberj@gamberjohnson.com
www.gamberjohnson.com
Page 1 of 2
Testing Summary
Samsung Active II Tablet Dual USB Docking Station
(7160-1368)
Summary of Tests Performed at Gamber-Johnson
Test Description Test Parameters
Vibration –
Operational
Test date: May, 2019
MIL-STD-810G, Method 514.6, Procedure 1, Category 4, per Figure
514.6C-1. Test duration is one hour along three mutually orthogonal
axes – not simultaneously (3 hours total).
Unit is unlocked
Vibration –
Non-Operational
(Minimum Integrity)
Test date: April, 2019
MIL-STD-810G, Method 514.6, Category 24, per Figure 514.6E-1. Test
duration is one hour along three mutually orthogonal axes – not
simultaneously.
Unit is unlocked
Functional Shock -
Non-Operational
Test date: April, 2019
MIL-STD-810G, Method 516.6, Procedure 1, 3 positive and 3 negative
pulses each axis (vertical, longitudinal and transverse), 18 pulses
20G, 11ms half sine
Unit is unlocked
Mechanical Shock
Safety -
Non-Operational
Test date: April, 2019
MIL-STD-810G, Method 516.6, Procedure 1, 3 positive and 3 negative
pulses each axis (vertical, longitudinal and transverse), 18 pulses
40G, 11ms half sine
Unit is unlocked
Electrostatic
Discharge –
Operational
Test date: April 2019
ISO 10605, Section 8, Table C.2, Category 2 – Direct Air Discharge
Summary of Tests Performed at Independent Facility
Test Description Test Parameters
Humidity
Test date: April 2019
MIL-STD 810G, Method 507.5, Procedure ll, Aggravated, Table 507.5-
l
Ten 24-hour cycles, temperature varied from 30ᵒC to 60ᵒC to
30°C at constant 95% relative humidity.
Low Temperature:
Operational
Test date: April 2019
MIL-STD 810G, Method 502.5, Procedure ll
-20ᵒC Operating, 24-hour duration
Low Temperature:
Storage
Test date: April 2019
MIL-STD 810G, Method 502.5, Procedure l
-40ᵒC Non-Operating, 24-hour duration
An ISO 9001:2015 certified company
Gamber-Johnson LLC 3001 Borham Avenue ∙ Stevens Point, Wisconsin 54481
PHONE: 1-715-344-3790 FAX: 1-715-344-5209 ∙ EMAIL: gamberj@gamberjohnson.com
www.gamberjohnson.com
Page 2 of 2
High Temperature:
Operational
Test date: April 2019
MIL-STD 810G, Method 501.5, Procedure ll, Table 501.5-ll, Induced
Conditions
Five 24-hour cycles, temperature varied from 30°C to 60°C to
30°C
High Temperature:
Storage
Test date April, 2019
MIL-STD 810G, Method 501.5, Procedure l, Table 501.5-lll, Induced
Conditions
Seven 24-hour cycles, temperature varied from 33ᵒC to 71ᵒC
to 33°C
Shock – Crash Hazard
Test date: 6/4/2019
SAE J1455, Section 4.11.3.5, per Figure 13
Unit is unlocked
EMC Testing
Test date: April 2019
EN 55032:2015
CISPR 32 – Class B
FCC Part 15, Subpart B – Class B
EMC Testing
Test date: April 2019
EN 50498:2010
Other Certifications
Description
EN 50581:2012 RoHS2 Directive 2011/65/EU


Specyfikacje produktu

Marka: Gamber-Johnson
Kategoria: Kołyska/stacja dokująca
Model: 7160-1368

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Gamber-Johnson 7160-1368, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Kołyska/stacja dokująca Gamber-Johnson

Instrukcje Kołyska/stacja dokująca

Najnowsze instrukcje dla Kołyska/stacja dokująca

Vorago

Vorago KSP-600 Instrukcja

9 Października 2024
Gembird

Gembird DD-U3M2 Instrukcja

9 Października 2024
Urban Factory

Urban Factory HCS02UF Instrukcja

9 Października 2024
Urban Factory

Urban Factory HCS01UF Instrukcja

9 Października 2024
Urban Factory

Urban Factory HCS04UF Instrukcja

9 Października 2024
Urban Factory

Urban Factory HCS03UF Instrukcja

9 Października 2024