Instrukcja obsługi Vemer Energy-400 D PWRi

Vemer Sprzęt pomiarowy Energy-400 D PWRi

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Vemer Energy-400 D PWRi (1 stron) w kategorii Sprzęt pomiarowy. Ta instrukcja była pomocna dla 11 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/1
Mod. Energy-400 D PWRi
Energy-400 D PWRi
V3IS00418-011
Vemer S.p.A.
I - 32032 Feltre (BL) • Via Camp Lonc, 16
Tel +39 0439 80638 • Fax +39 0439 80619
e-mail: info@vemer.it - web site: www.vemer.it
65
87
45
60
72
L3
L2
L1
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
PWR/PWRi PWRi
PWRi P1 P2
S1 S2
S1 S2
I
I
L3
L2
L1
+
L3
L1
L2L3
N
L1
L2
+
PWR P1 P2
User Manual
THREE-PHASE ACTIVE ENERGY METER
Read all the instructions carefully
 Seriesof4-DINsizestaticmeterstoreadactiveenergyconsumptionin400Vthree-phase
systems
 –ENERGY-400DPWRwithcurrentinletthroughshunt
 –ENERGY-400DPWRiwithcurrentinletthrough
coils
,withgalvanicisolationbetweenthe
primaryandthesecondary
 Connectiontothepowersourceisthroughexternal
ATs
typex/5A
SAFETY WARNINGS
To guarantee correct installation, observe the following instructions:
1) The appliance must be installed by a qualified operator
2) The appliance must be installed in an electrical panel which, after installation,
leaves terminals inaccessible
3) A protection device against over-currents must be installed in the electrical system
upstream of the energy meter
4) Connect the instruments as shown in the diagrams opposite
5) Before making contact with terminals, ensure that conductors to be connected to
the appliance are not live
6) Do not power or connect the appliance if any part of it is damaged
Code Model Description
VE119400 Energy-400 D PWR Three-phaseactiveenergymeter
VE120200 Energy-400 D PWRi Insulatedthree-phaseactiveenergymeter
TECHNICAL SPECIFICATIONS
• Powersupply:3x230(400)VAC(-15%÷+10%),50/60Hz
• InputCurrent:In = 5A; Imax=6A
• Startupcurrent:15mA
• Maximumconsumption:3,5VAto400VAC
• Accuracy:class2(EN62053-21)
• Maximumloss: voltagecircuits<2.5VA
  powercircuits<2.5VA
• Galvanicisolationbetweenthevoltageinputsandthecurrentinputs(formodel
PWRi only
).
• AmperometricconnectionbyexternalATx/5A
• Display:bywayof7+5digitLCDdisplayunits
• Partialenergyresolution:xed1kWh
• Totalenergyresolution:xed1kWh
• Pulseproperties:Length:100ms±15%
  Voltage:9÷24VCC±10%
  Maximumoutputcurrent:20mA
• Signalingleds:green=poweron
  red=ashingat1/4kWh
  yellow=wrongconnection
• Optoinsulatedpulseoutputforremotemeterreading
• Operatingconditions:Temperature:-10÷+45°C
  Relativehumidity:10%÷90%noncondensing
• Storagetemperature:-25°C÷+70°C
• Enclosure:4DINsizes
• IngressprotectionratingIP:IP20/IP51onthefront
INSTALLATION
1) Onpoweringthedeviceup,selectthetransformationratioaccordingtotheexternalATx/5A
used.TheATsecondariesofthesolePWRimodelcanbeconnectedtotheearthingsystem
2) Thedevicemustbeconnectedasinthediagram,observingATenergydirection
3) Inorderfortheerrortostaywithinthedevice’sclasslimitsitisnecessarytousethecurrent
transformer in its linear operating range
PROGRAMMING EXTERNAL ATS (X/5A)
 SwitchthedeviceonwhileholdingdownthePRGkeyuntilthe
rmwareversionpageappears.
 PressthePRGkeytoaccessthepagereadingthedevice’sserialnumber
andthentheATsettingpage.
 TherstvaluedisplayedistheATprimary,accordingtothesettingsassignedtothedevice
untilthen.TosettheATvalue,selectthedigitthatneedstobechangedusingthePRGkey.
Whenthedigitselectedashes,changeitusingthearrowkeys and .Therangeof
availablevaluesisfrom0005to1000.ToexittheprogrammingmodeholdthePRGkeydown
foratleast3seconds.IfwhileintheATsettingwindow,nokeyispressedfor30seconds,this
willbeexitedandnochangewillbestored.
 Thedefaultfactorysettingis5/5A.
Note: When the AT setting is altered, then the partial energy meter is zeroed, whereas
the total energy meter remains unchanged.
OPERATION
• Whenthedeviceisturnedonthemainpageisdisplayed,representing
thetotalenergycountonthe7-digitupperblockandthepartialenergy
countonthe5-digitlowerblockThemeasuringresolutionforboth
metersis1kWh
• Todisplaythe
total
energycountonly,pressthe key:thismeter
cannot be set to zero
• Todisplaythe
partial
energyreading,pressthe keyagain:this
metercanalsobezeroedmanuallyanytimebyholdingthe“Prg”key
pressedformorethanfourseconds
• Toreturntothemainpagereadingbothmeters(totalandpartial
energy),pressthe keyagain
Pressthe keytoreverttheabovedescribedsequence.i.e.scrollthe
pagesbackward.
Note: The energy value reading refers to the complete three-phase system as an
algebraic addition (Etot
= E1
+E2+E3)
BACKLIGHTING
 Backlightingisenabledbydefault:itisswitchedoneachtimethekey
ispressedandstaysonfor30secondsafterthelastkeyispressed.In
ordertoenable/disablethebacklighting,gothe
main page
andhold
the“Prg”keypressedforatleast4seconds:theON/OFFbacklight
statuswillbedisplayedforacoupleofseconds,afterwhichthemain
pagewillreturn.
CONNECTION CHECKS
 Whenthedeviceisswitchedon,correctconnectiontocurrentand
voltageterminalsarechecked.Ifconnectionisincorrect,theyellow
LEDlightsupforthreeminutesandthengoesoff.
 Atthisstageandduringnormaloperationitispossibletoviewthe
detailedconnectionstatusbyholdingdownthePRGpush-buttonfrom
thetotalmeterpage:theATsettingpage(read-onlyatthisstage)and
theconnectionstatuspagewillthenbedisplayedsuccessively,withthe
possibleerrors(ifany).
 Incaseoferrorthefollowingmessagesmayappearonthedisplay:
 Connectionerrorononephase(L1inthiscase)
E1 is negative
 Connectionerrorontwophases(L1andL2inthiscase)
 E1andE2arenegative
 Connectionerroronthreephases
 E1,E2andE3arenegative
 Toexittheerrorreadingpage,pressthePRGkey.
 Ifnoerroristobereportedthe“noError“messagewillbereadfora
coupleofseconds.Thenthedevicewillresumenormaloperationfrom
thetotalenergypage.
Note: to restore correct meter operation after an error reading has been displayed,
switch the meter off, connect voltage and current as in the diagrams and then switch
the meter back on.
STANDARD REFERENCES
ConformitytotheEUdirectives:
2006/95/EC
(LowVoltage)
89/336/EEC
modiedby
92/31/EEC
and
93/68/EEC
(E.M.C.)
isdeclaredwithreferencetothefollowingharmonisedstandards:
Safety:
EN61010-1
Electromagnetic compatibility:
EN62052-11andEN62053-21
Dimensions
Connection diagram
Description
ON
PRG
Energy-400 D PWRi
3x230/400V~ 50/60 Hz
In/5(6)A~ cl.2
!
1/4 kWh
imp
Totalenergy
Signaling led
Partialenergy
Pulse output
blocks
Voltage lead
connectionblocks
Setting and
selectionkeys
Current lead
connectionblocks
Main page
Total meter
Partial meter
Backlighting status


Specyfikacje produktu

Marka: Vemer
Kategoria: Sprzęt pomiarowy
Model: Energy-400 D PWRi

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Vemer Energy-400 D PWRi, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Sprzęt pomiarowy Vemer

Instrukcje Sprzęt pomiarowy

Najnowsze instrukcje dla Sprzęt pomiarowy

Stamos

Stamos S-LS-28 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-86 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-61 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-81 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-84 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-74 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-76 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-42 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-75 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-35 Instrukcja

15 Października 2024