Instrukcja obsługi Vantage Point PTC20


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Vantage Point PTC20 (2 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 3 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/2
Preview all 7 steps before beginning. Should any portion of these instructions be unclear, contact a qualified contractor, handyman or call us
direct at 800-582-9595 for assistance. Do not attempt to install this Vantage Point television ceiling mount if you have any doubts as to its proper
installation. CAUTION- This Television Ceiling Mount is intended for use only with maximum weight indicated. Use with heavier than the maximum
weights indicated may result in instability causing possible injury. Use of this product for any other purpose unless specified by Vantage Point
Products is not recommended. Think safety first!
Δ INDICATES TO NOTE CAUTION, WHICH IF NEGLECTED MAY RESULT IN AN IMPROPER OR UNSTABLE ASSEMBLY.
Before placing the television on the ceiling mount, slide the safety strap (K)
through both front slots on the platform (E), as shown. Have the safety strap
(K) hang down from the platform ready for the television placement. Next, with
adequate assistance place the television on the ceiling mount and secure the
safety strap (K) immediately, as shown.
Δ Deter tampering with the safety strap (K) by locating the strap buckle on the
top of the television.
J
SPECIFICATIONS and RATINGS
TV SIZE MODEL # IN BLACK MODEL # IN WHITE MAX. LOAD LISTED
13" – 17" PTC13-B PTC13-W 60 LBS. YES*
19" – 21" PTC20-B PTC20-W 60 LBS. YES*
25" – 27" PTC26-B PTC26-W 80 LBS. YES*
* TESTED TO 4 TIMES MAX. LOAD RATING By Underwriters Laboratories Inc
K
D
C
A
B
F
B
H
I
GE
A
B
F
I
Installed at
factory
Installed
at factory
Step 7
Television
Ceiling Mount Instructions
For Models PTC13 and PTC20
Vantage Point Products Corp. P.O. Box 2485, Santa Fe Springs, CA 90670
U.S.A. Tel: 562.946.1718 Canada Tel: 905.607.9994 Web Site: www.vanptc.com Email: cons-serv@vanptc.com
FIG. ITEM DESCRIPTION QTY
A Platform Bolt 3/8”-16 x 2-1/2” custom hex head bolt 2
B Indexing Washer 3/8” custom indexing flat washer 4
C Ceiling Plate Steel ceiling plate 1
D Plastic Cover Plastic rounded ceiling plate cover 1
E Platform Steel platform 1
F Bearing Ring 3” plastic bearing ring 2
(installed at factory)
G Steel Frame C” shaped tubular steel arm 1
H Flange Nut 3/8”-16 serrated flange nut 2
I Dome Cap 3” plastic Dome cap 2
J Lag Screw #14 x 2-1/2” hex head lag screws 4
K Safety Strap 1-1/2” polypropylene strap 1
All VANTAGE POINT products are manufactured to ensure superior quality, performance and durability for a lifetime of use. Warranty covers the product to be free
from defects in the materials and workmanship under normal and reasonable use. Vantage Point Products will repair or replace, at our option, any product which
proves to be defective upon our inspection. This warranty will not apply to products which have been lost or damaged by misuse, abuse or accident, altered or
repaired in any way by any person or firm other than us, used in violation of instructions or an incorrect assembly nor used in a manner other than specified by
us. The warranty is nontransferable to a new owner and may require proof of purchase. All claims must be directly handled with Vantage Point Products Corp.
6i04-07/03
B
H
Tools
Required
Snap the plastic cover (D) in place over the ceiling plate (C).
Use a stud sensor to locate the framing member (joist) near the desired
mounting position for the ceiling mount.
Using a sharp device (ie. drill bit or
ice pick), penetrate the ceiling to identify the true center of the joist.
The ceiling
plate (C) will cover the holes that are made.
NOTE: The joist members are typically 1-1/2” wide and spaced 16” on center apart.
Some joist spacing may be 24” rather than 16” on center.
Use the ceiling plate (C) as a template to mark four holes. Make sure to align the
ceiling plate, so that the lag screw mounting holes lie in the center of the joist.
Once the holes have been marked, drill four holes, 2-1/4” deep using a 5/32” drill
bit. Slide an indexing washer (B) onto a platform bolt (A) and drop the platform bolt
and indexing washer assembly through the center hole of the top (concave side)
of the ceiling plate (C). Using the lag screws (J), mount the ceiling plate (C) to the
ceiling. It is important that all four lag screws (J) are used and tightened down. This
will prevent the heads of the lag screws from sticking out, interfering with the plas-
tic cover and will insure the maximum holding strength of the unit.
Δ Caution: Drilling oversized holes may cause the lag screws (L) to pullout
and undersized holes may cause breakage of lag screws (L) during installation.
Attach the steel frame to the ceiling plate by slipping the plate bolt (A) through the
upper hole in the frame(G). Slide an indexing washer (B) onto the end of the “D”
shaped bolt , then secure the steel frame in place by screwing a flange nut (H) snugly
onto the “D” shaped bolt (A).
Tighten the flange nut to desired swivel resistance.
When unit is secure, insert dome cap (I) onto the bottom of the circular end of the
steel frame (G) as shown in the illustration to the left.
Δ Note: If a VCR bracket is being used, refer to the VCR instructions before
assembling the platform to the arm.
The platform for the PTC13 and the PTC20 has three hole positions to produce
different degrees of angle (refer to Fig. A for the desired angle position). Using a
platform bolt (A), an indexing washer (B) and a flange nut (H) attach the platform (E)
to the circular end of the steel frame arm (G), as shown. Tighten the flange nut (H) to
desired swivel resistance.
CAREFUL! Do not over tighten nut, or the platform (E)
will not rotate.
When the platform is secure, insert dome cap (I) to the bottom portion
of the circular end of the steel frame arm (G).
Locate the desired mounting position. Recommended minimum distance from the
nearest wall is 20 inches for the PTC20 and 16for the PTC13. Suggestions: avoid
foot traffic areas and consider proximity of power and antenna connections.
Δ Hardware supplied for wood joist construction only! Hardware NOT intended
for metal joist installation, please call us direct at 800-582-9595 for further
instructions.
Δ
This mount is only designed for use on flat ceilings, it will not work on angled or
vaulted ceilings!
Some joist
spacing may
be 24” rather
than 16”.
Fig. A
C
J
A
B
D
E
A
B
B
I
H
Step 6
Step 5
Step 4Step 1
Step 2
Step 3
Stud
Sensor
C
GB
H
I
PTC13, PTC20


Specyfikacje produktu

Marka: Vantage Point
Kategoria: Niesklasyfikowane
Model: PTC20

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Vantage Point PTC20, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Vantage Point

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

Stihl

Stihl HT 70 Instrukcja

15 Października 2024
Ernesto

Ernesto H14270 Instrukcja

15 Października 2024
Uniden

Uniden BT MIC KIT Instrukcja

15 Października 2024
Vaude

Vaude Omnis Bike 26 Instrukcja

15 Października 2024
ART

ART ProChannel II Instrukcja

15 Października 2024
Aukey

Aukey DR02J Instrukcja

15 Października 2024
Master Lock

Master Lock 653EURD Instrukcja

15 Października 2024
Roland

Roland FR-18 Diatonic Instrukcja

15 Października 2024