Instrukcja obsługi Rigol RM-1-DG1000Z

Rigol Niesklasyfikowane RM-1-DG1000Z

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Rigol RM-1-DG1000Z (2 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 7 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/2
RIGOL
1
Rack Mount Kit
DG2000&DG1000Z&DSG800
to mount RIGOL DG2000/DG1000Z series
erator or DSG800 RF signal source into a 19-inch cabinet
that conforms to the Electronic Industries Association (EIA) standard. This manual takes
DG1000Z as an example to introduce the installation method.
Kit Part Checklist
No. Name Qty. Description
RM-1-DG1000Z [1] RM-2-DG1000Z [1]
1 Front Plate 1 None --
2 Fastener 1 2 --
3 Connecting Plate A None 1 --
4 Connecting Plate B None 1 --
5 Retaining Bracket None 2 --
6 M4 Countersunk Flat
Head Screw None 4 M4x10 Phillips Pan
Head Screw
7 M4 Pan Head Screw 4 8 M4x8 Phillips Pan
Head Screw
8 M6 Pan Head Screw 4 4 M6x16 Phillips Pan
Head Screw
9 M6 Nut 4 4 M6 Square Lock
Cage Nut
Note[1]:RM-1-DG1000Z is designed for installing a single instrument, and RM-2-DG1000Z for two instruments.
2
3
4
5
6
7
8
9
1
6 7 8 9
Installation Guide RIGOL
2
Installation Tool
The PH2 Phillips screwdriver and T20 Phillips screwdriver are recommended.
Space Requirements
To mount the instrument into the cabinet correctly, please ensure that the following
requirements are met.
The cabinet must be a standard 19-inch one.
The available height of the cabinet should be at least 2U (88mm).
The depth of the cabinet should be at least 400mm.
The dimensions of the rack are as shown below.
RM-1-DG1000Z Unit: mm
RM-2-DG1000Z Unit: mm
Installation Procedures
CAUTION
Only authorized operators are allowed to perform the installation. Improper
installation might cause damage to the instrument or an installation failure.
Installation Guide RIGOL
3
Pre-Installation Preparation: Dissemble the handle and protective rubber
covers
1. Rotate the handle upright. Then, pull it out from the sides of the instrument to remove
it.
2. Use the T20 Phillips screwdriver to remove eight M4 screws at four corners of the front
panel and four M4 screws at four corners of the rear panel. Then, take off the eight
protective rubber covers.
Mount a single instrument (Requiring to order a set of
RM-1-DG1000Z)
1. Attach the fastener to one side of the
front panel, then secure the fastener
with two M4 pan head screws.
2. Attach the front plate to the other side
of the front panel, then secure the
plate using two M4 pan head screws.
3. Mount the assembled instrument and
rack into a standard 19-inch cabinet
using four M6 pan head screws and
four M6 square nuts.
-End-
Mount two instruments (Requiring to order a set of RM-2-DG1000Z)
1. Attach one fastener to the right side of
the front panel of Instrument A, then
secure the fastener with two M4 pan
head screws. Attach Connecting Plate A
to the left side of the front panel of
Instrument A, and then use two M4
countersunk head screws to fasten
Connecting Plate A to Instrument A.
Instrument A
Fastener
Connecting Plate A
Installation Guide RIGOL
4
2. Attach another fastener to the left side
of the front panel of Instrument B, then
secure the fastener with two M4 pan
head screws. Attach Connecting Plate B
to the right side of Instrument B, and
then use two M4 countersunk head
screws to fasten Connecting Plate B to
Instrument B.
3. Joint Connecting Plate A with
Connecting Plate B.
4. Place two retaining brackets onto the
connecting position of rear panels of
two instruments, and then secure the
retaining brackets with four M4 pan
head screws.
5. Mount the assembled instrument and
rack into a standard 19-inch cabinet
using four M6 pan head screws and
four M6 square nuts.
-End-
Instrument B
Fastener
Connecting Plate B
Instrument A
Instrument B


Specyfikacje produktu

Marka: Rigol
Kategoria: Niesklasyfikowane
Model: RM-1-DG1000Z

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Rigol RM-1-DG1000Z, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Rigol

Rigol

Rigol NFP-3 Instrukcja

8 Października 2024
Rigol

Rigol PVA7250 Instrukcja

7 Października 2024
Rigol

Rigol PHA1150 Instrukcja

7 Października 2024
Rigol

Rigol RM-DG Instrukcja

30 Września 2024
Rigol

Rigol RM-1-DG1000Z Instrukcja

30 Września 2024
Rigol

Rigol PVP2150 Instrukcja

30 Września 2024
Rigol

Rigol PVP3150 Instrukcja

29 Września 2024
Rigol

Rigol PVP2350 Instrukcja

29 Września 2024
Rigol

Rigol PVA8700 Instrukcja

29 Września 2024
Rigol

Rigol RP5600A Instrukcja

29 Września 2024

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

Stihl

Stihl HT 70 Instrukcja

15 Października 2024
Ernesto

Ernesto H14270 Instrukcja

15 Października 2024
Uniden

Uniden BT MIC KIT Instrukcja

15 Października 2024
Vaude

Vaude Omnis Bike 26 Instrukcja

15 Października 2024
ART

ART ProChannel II Instrukcja

15 Października 2024
Aukey

Aukey DR02J Instrukcja

15 Października 2024
Master Lock

Master Lock 653EURD Instrukcja

15 Października 2024
Roland

Roland FR-18 Diatonic Instrukcja

15 Października 2024