Instrukcja obsługi IQE Simplicity 35

IQE Kotły i bojlery Simplicity 35

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla IQE Simplicity 35 (12 stron) w kategorii Kotły i bojlery. Ta instrukcja była pomocna dla 8 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/12
iQ© SIMPLICITY
25-30-35-20 T-25 T-30 T
USER INSTRUCTIONS
ENSURE THAT THESE
INSTRUCTIONS ARE LEFT
FOR THE USER AFTER
COMPLETION OF THE
BENCHMARK SECTION
PLEASE READ THE
IMPORTANT NOTICE
WITHIN THIS GUIDE
REGARDING YOUR BOILER
WARRANTY
only the combi version
IQ© SIMPL IC ITY 25-30-35
I
benchmark
CaiKHVEMAm
i Q G
Cleve r En erg y
TM
IMPORTANT NOTICE
For the firs t ye ar all of our appliances are protected by our m an ufacturers guarantee which covers
both parts and labour.
As you would expect f r o m ^ © , it is o ur aim to provide our valued custom ers with the best in after
sales and service. To take advantage of any extended w arran ty offered, all you have to do is to
adhere to these 3 s imple conditions:
The installation must be carried out to M anufa ctu re rs/B ench m ark Standards by a Gas Safe
Registered Engineer, and recorded in the installation manual.
The appliance must be registered with b o t h ^ © and Gas Safe within 30 days of installation.
The appliance must be serviced annually, by a Gas Safe registered engineer-ensuring that the
Benchm ark service record in the installation m anual is completed.
Failure to comply with the above w ill result in only the 12 month w arran ty being offered.
In the absence of any proof of purchase, the 12 month w arranty period w ill commence fro m the date
of manufacture of the boiler as shown on the appliance data plate.
J
AH descrip tion s and illu s tratio n s provided in th is m a nual have been c a re fu lly prepa re d but w e reserve the rig ht to make
changes and im prov em ents in o ur p roducts tha t m ay affect the accuracy of the inform ation contained in this m anual.
Code Of Practice
For the installation, commissioning and servicing
of domestic heating and hot water products
Benchmark places responsibilities on
both manufacturers and installers.*
The purpose is to ensure that
customers** are provided with the
correct equipment for their needs, that it
is installed, commissioned and serviced
in accordance with the manufacturers
instructions by competent persons
and that it meets the requirements of
the appropriate Building Regulations.
Installers are required to carry out work
in accordance with the following:
Standards of Work
Be competenl and qualified to undertake the work
required.
Install, commission, service and use products in
accordance with the manufactLirer's instructions provided.
Ensure that where there is responsibility for design work,
the installation is correctly sized and fit for purpose,
Meet the requirements of the appropriate Building
Regulations, Where this involves notifiable work be a
member of Competent Persons Scheme or conrm thata
the customer has notified Local Authority Building Control
(LABC), prior work commencing.10
Complete all relevant sections of the Benchmark
Checklist/Service Record when carrying out
commissioning or servicing of a product or system.
Ensure that the product or system is left in a safe
condition and, whenever possible, in good working order.
Highlight to the customer eny remedial or improvement
work identified during the course of commissioning or
servicing work.
Refer to the manufacturer's helpline where assistance is
needed,
Report product faults and concerns to the manufacturer
in a timely manner,
m N VK. DF D UR im Ftfi THE IHSTRL1AT1W. CDMfiSIDHIHD
W SHTOHC KWEFtlC PeRTWS W WHtiTtf tFFIWS
'Ttia irse of tlw woR] "installer" Is not llinltecl to Installatlart Itsall and cavers
ttiose carrylrts sul Inetallalion, commissioning and/or setviang of heating
and hot watet products, or me use of supporting products (such as water
VeatmenL or test egulpmenl).
"Oastomer Includes householders, landlords and tenants.
Customer Service
* Show the customer any identity card that is relevant to
the work being carried out prior to commencement or on
request,
* Give a full and clear expianation/demonstration of the
product or system and its operation to the customer.
* Hand over the manufacturer's instructions, including the
Benchmark Checklist, to the customer on completion of
an installation,
* Ctitain the customer’s signature, on the Benchmark
Checklist, to confirm satisfactory demonstration and
receipt of manufacturer's in struct ions.
* Advise the customer that regular product servicing is
needed, in line with manufacturers' recommendalaons,
to ensure that safety and effciency is maintained.
* Respond promptly to calls from a customer following
completion of work, providing advice and assistance by
phone and, if neoessaiy, visiting the customer.
* Rectify any installation problems at no cost to tha
customer during the installer’s guarantee period,
© Healing and Hotwaler Industry Council (HHIC) www.cantralheatina, c o.i*


Specyfikacje produktu

Marka: IQE
Kategoria: Kotły i bojlery
Model: Simplicity 35

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z IQE Simplicity 35, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Kotły i bojlery IQE

IQE

IQE Simplicity 25 Instrukcja

7 Września 2024
IQE

IQE Comfort Instrukcja

7 Września 2024
IQE

IQE Simplicity 35 Instrukcja

7 Września 2024

Instrukcje Kotły i bojlery

Najnowsze instrukcje dla Kotły i bojlery

Sencor

Sencor SWK 7706GD Instrukcja

14 Października 2024
Hotpoint

Hotpoint HE30S01SAG Instrukcja

13 Października 2024
Nibe

Nibe VPA 300/200 E Instrukcja

9 Października 2024
Noritz

Noritz NC199OD Instrukcja

9 Października 2024
Nibe

Nibe Melite 120 Instrukcja

8 Października 2024
Nibe

Nibe VPB 500-1000 Instrukcja

8 Października 2024
Elba

Elba EWH-E3881(SW) Instrukcja

8 Października 2024
Elba

Elba EWH-E3885DC(SG) Instrukcja

8 Października 2024
Elba

Elba EWH-G3661(MB) Instrukcja

8 Października 2024