2 Wide x 2 Deep Video Wall Display (Rear View)
This display kit mounts the NEC X463UN
LCD monitor in a 2 wide by 2 deep landscape
configuration. The frame attaches to a wall and
receives the LCD monitors by way of four machined
fittings (per monitor) that thread into the monitor’s
VESA holes. These fittings then insert into the frame’s
channels. The monitor’s fittings secure to the frame
with locking arms that provide an easy way to remove
the monitors for service. A removable panel provides
access for media players behind the frame.
Important: Installing video displays is a serious
endeavor that requires experienced professionals.
Improperly prepared walls and other structures as
well as the equipment being installed can result in
property damage, injury and/or liability to the
installing contractor. Do not proceed if any part of
the installation is in doubt.
Caution: Due to the wide variety of structures,
environments, materials and installation methods, the
installing contractor must exercise good judgment in
selecting the proper mounting area. The mounting
structure must be capable of supporting at least 5
times the load of the installed equipment. Consult local
building codes for further guidance.
Follow these instructions for the most efficient and
safest mounting results.
Package Contents:
1 pc Frame w/ locking arms assembled
2 pcs Media player mounting bracket
1 pc Adjustment wrench
16 pcs M6 Threaded stand-off button (black)
9 pcs Wood Screw Hanger (Adjustable Lag bolts)
9 pcs Flat washer, 5/16
9 pcs Hex nuts, 5/16-18
1 pc Instruction sheet
Notes:
Hardware to mount frame to the wall are included.
Note:
The assembled frame weighs approximately 65 lb/29.5 Kg and requires just one installer. Two installers recommended for installing the
LCD monitors.
Installation Instructions
TH-VA-2X2-NEC X463
Video Wall 2x2
Rev.02-06/25/12
Figure 1
Figure 2
Step 1: Mount Frame to Wall
Scribe a horizontal line on the
wall showing the exact location
of the top edge of the upper left
LCD monitor will be. Measure
down 8.8” (223.5mm) from that
line and scribe another
horizontal line showing where
the first location of the
adjustable lag bolts for the
mounting frame will be. This is
for the top left keyhole slot
(Figure 1).
Scribe a vertical line showing
where the left side of the upper
LCD monitor will be. Measure to
the right and scribe another
vertical line 12.6” (320mm) to
locate the location of the first
adjustable lag bolts for the
mounting frame will be. This is for the top right keyhole slot
(Figure 1).
Mark where the 2nd horizontal line vertical lines meets.
Measure 55.7” (1414.8mm) to the right for next location of the
adjustable lag bolt. Use a level then mark the second location,
use level to make sure it Is horizontally level to the first hole
on the left side. Pre-drill the marked locations using a 3/16
(5mm) drill (Figure 1).
Install the adjustable lag bolts to the pre-drilled holes then
hang the frame onto the two adjustable studs. Install the flat
washer and hex nut to secure frame to wall. Hand tighten hex
nut only (Figure 2).
Step 3:
Mark the location for the other adjustable lag
bolts, one upper center keyhole, three bottom
keyholes slots and three center middle holes
(Figure 3).
Step 4:
Remove the two nuts and washer securing the
frame to the wall and place the frame back on
the floor. Pre-drill all the marked locations
using 3/16” drill bit then install the adjustable
lag bolts (Figure 3 and 4).
Step 5:
Figure 3
Rev.02-06/25/12
Figure 6
Figure 7
Re-place the frame on the wall then secure using the provided hex
nut and flat washer. Hand tighten hex nut only (Figure 4).
Step 6:
Using a 4 or 5 feet long level plum the frame by adjusting the
adjustable lag bolts on the vertical channels counter clockwise to pull
the frame frontward. Use the provided adjustment wrench to rotate
the adjustable lag bolts. Use the level or straight edge to make the
H-slat horizontally straight by adjusting the adjustable lag bolt closest
to the H-slat (Figure 5).
Step 7:
Once the frame is plummed and level tighten the hex nuts
permanently.
Step 8: Install Brackets to Media Player
Attach the media player brackets to the sides of the media
player using its existing side screws (Figure 6).
Step 9: Install Media Player
Choose and remove the bottom left or right lower H-slat frame by
unscrewing its flat head screws Install the media player to (Figure 7).
the wall between the two vertical channels using the appropriate fasteners
through the media player’s brackets Re-install the bottom (Figure 7).
lower H-slat.
Figure 4
Figure 5

Specyfikacje produktu

Marka: Atdec
Kategoria: без категории
Model: TH-VA-2X2-NECX-463

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Atdec TH-VA-2X2-NECX-463, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje без категории Atdec

Instrukcje без категории

Najnowsze instrukcje dla без категории

Technaxx

Technaxx TX-182 Instrukcja

23 Września 2024
Holman

Holman BTX1 Instrukcja

22 Września 2024
Gravity

Gravity Vari-G 7 Instrukcja

22 Września 2024
Ridgid

Ridgid RE 60 Instrukcja

22 Września 2024
ATen

ATen VE-RMK1U Instrukcja

22 Września 2024
LG

LG WF-T7016PP Instrukcja

21 Września 2024