Instrukcja obsługi Vemer SOLAR-3


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Vemer SOLAR-3 (3 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 7 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/3
3
4
1 5 OPERATIONUser Manual
LOADS CONTROL 3 RELAYS FOR ENERGY PRODUCTION
Read all the instructions carefully
DIMENSIONS
INSTRUMENT DESCRIPTION
INSTALLATION
272 60
88
45
1
2
3
4.1
4.2
4
5
6
Alar m
PRG
PC3R
Out 1 Out 2 Out 3
ON OFF O N OFF
ON OFF
Re se t
Alar m
PRG
PC3R
Out 1 Out 2 Out 3
ON OFF ON OFFON OFF
Re se t
Alar m
PRG
PC3R
Out 1 Out 2 Out 3
ON OFF ON OFFON OFF
Re se t
Alar m
PRG
PC3R
Out 1 Out 2 Out 3
ON OFF ON OFFON OFF
Re se t
Alar m
PRG
PC3R
Out 1 Out 2 Out 3
ON OFF ON OFFON OFF
Re se t
Alar m
PRG
PC3R
Out 1 Out 2 Out 3
ON OFF ON OFFON OFF
Re se t
PRG
PRG PRG PRG PRG PRG PRG PRG PRG
PRG
Setpoint - Hysteresis
connection
loads
zone
disconnection
loads
zone
delay OFFdelay ON delay ON
Time
Power
Setpoint
Connection load 2 ( the second one more priority)
Discon-
nection
load 2
Connection load 1 (more priority)
1 2 3 1 2 3 1 2 3 1 2 3 1 2 3
Connection load 2
connected load disconnected load surplus of produced power
Power supply
LV Network = Low Voltage Network
CP = Connection Point
DG = General Device
Vemer S.p.A.
I - 32032 Feltre (BL) • Via Camp Lonc, 16
Tel +39 0439 80638 • Fax +39 0439 80619
e-mail: info@vemer.it - web site: www.vemer.it
V3IS00705-012
Mod. SOLAR-3
Red led: on if the consumed power is higher than the setpoint
Keys increase/ decrease
Key PRG: instrument programming/confirmation
- brief pressure = lower than 3 seconds
- long pressure = higher than 3 seconds
Data view display
4.1 Surplus of measured power
4.2 Segments for loads status indication
(disconnected = fixed on, connected = flashing)
Power supply terminals/inputs
Terminals 6-8: voltage input/instrument power supply
Terminals 8-9: current input through current transformer
Relays terminals for loads connection
Electronic instrument for the control of active power self-produced by your
photovoltaic system.
If the power entered on the network (surplus of power, that is to say produced
power – consumed power) is higher than a programmed threshold (setpoint)
the SOLAR 3 provides for the connection of some loads that you can stop in
order to maximize the own consumption of the produced power. It’s possible
to control until 3 loads (or groups of loads) through the command of as many
relays, to whom is assigned a priority which sets the order with whom the loads
are connected.
Code Model Description
VE474300 SOLAR-3 Loads control for systems of energy production 3 relays
SAFETY WARNINGS
During the installation and the operation of the instrument it’s necessary to
observe the following instructions:
1) The instrument must be installed by a qualified person by observing
scrupulously the connection diagrams
2) The instrument must be installed and activated in compliance with current
electric systems standards.
3) After installation, inaccessibility to the connection terminals without appropriate
tools must be granted
4) Do not use the instrument for other purposes different from the one specified
5) The instrument must be installed in a closed electrical panel adequately
protected
6) In the power supply network a bipolar disconnection must be present
7) A protection device against over-currents should be installed in the electrical
system, upstream of the device.
8) Before accessing the connection terminals, verify that the leads are not live
9) Do not power on or connect the instrument if any part of it is damaged
10) In case of malfunction do not perform repairs and contact immediately the
technical support
11) The instrument can be used in environments with category of measurement III
and pollution degree 2, as per standards CEI EN 61010-1.
TECHNICAL CHARACTERISTICS
Power supply: 230Vac (-15% ÷ +10%) 50/60 Hz
Maximum own consumption: 8 VA
Voltage input consumption: < 2,5VA
Current input consumption: < 2,5VA
Measurement precision: 2% full scale
Current connection until 60A through current transformer
Settable setpoint range: 0,1 ÷ 15 kW
Settable hysteresis range: 0 ÷ setpoint
Output: 3 monostable relays with exchange contact 16A / 250Vac
Blocks for cables with maximum section of 6 mm
2
Operating temperature: -10°C ÷ 45°C
Operating humidity: 10% ÷ 90% non condensing
Storage temperature: -10°C ÷ +65° C
Container: 4 modules DIN
Protection degree: IP20 / IP51 (on the front panel)
Insulation: reinforced between accessible parts (front panel) and all other terminals
Type of actions: 1B
The positioning of the current transformer is essential for the correct operation of the
instrument.
The correct position of the current transformer within the electrical system is
shown in the picture 1
The direction of the produced current (i) is shown in the picture 2 (incoming
current in the current transformer form the side indicated on the label)
The current transformer must be connected to the terminals 8 and 9 of SOLAR-3:
- terminal 8: white thread
- terminal 9: black thread
Four loads or groups of loads must be located:
not disconnectable loads, that is to say the loads which are always connected
to the electrical line and which will not disconnect by SOLAR-3 if the production
of energy is lower than necessary (their consumption must be counted anyway by
SOLAR-3 to determine the total consumption)
connectable loads with priority 1, which will be connected for first if the surplus
of power is higher than the setpoint
connectable loads with priority 2
connectable loads with priority 3
The SOLAR-3 switches on with the disconnected loads; every seconds Delay On
one load is connected (if the surplus of power is higher than the setpoint).
During the normal operation the instrument shows the
surplus of produced power (expressed with two decimals)
and relays status (segment on fixed if disconnected load,
flashing segment if connected load)
The programmed setpoint can be showed for three
seconds by pressing the key .
Configuration relays (normally
open or normally closed) can be
showed by pressing the key
and then relays priority. Each
display is visible for 3 seconds.
The device reset can be performed by pressing simultaneously the keys
and : the loads are disconnected and then reconnected according to the set
priority.
DEFINITION AND MODIFICATION OF OPERATION PARAMETERS
[kW] represents the activation threshold that is to say the minimum value of surplus of power so that the instrument provides for the connection of the loads Setpoint
according to the priority.
Hysteresis (or differential) (kW) represents the value to subtract from the setpoint to determine the disconnection zone (that is to say the zone where the loads are
disconnected).
For example, if the setpoint = 3 Kw and differential = 0.5 kW the loads eventually connected are disconnected if the value of measured absorbed power is lower than 2.5 kW.
Delay On [seconds] represents the minimum time which must elapse from the last connection (or disconnection) of one load before connecting another one. This time is
valid also at start-up that is to say , even if the surplus of power allowed, no load is connected before Delay seconds elapse from the switch on.
Delay Off
[seconds] represents the delay of disconnection, that is to say how long the surplus of power must result lower than the
setpoint – hysteresis before the instrument
disconnects one load.
To access the modification or the operation parameters display press the key .
REFERENCE STANDARDS
Compliance with Community Directives:
2006/95/EC (Low Voltage) 2004/108/EC (E.M.C.)
is declared with reference to the following standards:
• EN 61010-1
• EN 61000-6-2 and 61000-6-3
Not
disconnectable
loads
Connectable
loads with
priority 1
Connectable
loads with
priority 2
Connectable
loads with
priority 3
OPERATION LOGIC
Setpoint modification
Value: 0.1 ÷ 15 kW
default = 1 kW
Hysteresis modification
Value: 0 ÷ setpoint kW
default = 0 kW
Intervention time
modification
Value: 10 ÷ 999 s
default = 30 s
Disconnection time
modification
Value: 10 ÷ 999 s
default = 30 s
Example of valid connection
with priority and not modified
logic of relays operation
i
8 9
Picture 1 Picture 2 Picture 3
LV Network
M1
Measurement
exchanged
energy
M2
Measurement
produced
energy
User loads
kWh
DG
CP
Current transformer
i = produced current
kWh
kvarh
kvarh
i
Photovoltaic panels
6ADVANCED PROGRAMMING
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON O FF
ON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON O FF
ON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON O FF
ON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON O FF
ON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON O FF
ON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON O FF
ON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON O FF
ON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON O FF
ON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON O FF
ON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFO N OFF
Re s e t
Ala rm
PRG
PC3R
Out 1 Out 2 O ut 3
ON OFF ON OFFON OFF
Re s e t
> 3s
CNCNA
C NCNA
PRG
ON OFF
PRG
ON OFF
CNCNA
CNCNA
PRG
ON OFF
PRG
ON OFF
Ala rm
Re s e t
Ala rm
Re s e t
Ala rm
Re s e t
Ala rm
Re s e t
PRG
PRG
PRG PRG PRG PRG PRG PRG PRG PRG PRG PRG PRG PRG PRG PRG
FW Versione Relays priority
Logic of relays operation Backlighting
To access the advanced programming press the key for at least3 seconds
This menu allows: the firmware version display, the modification of the logic of relays operation, the modification of relays priority, the setting of the instrument backlighting.
The output from the menu of advanced programming restarts the microcontroller. This means that the loads eventually connected are disconnected and then reconnected one at time every seconds (only if the power production allow this).Delay.On
It displays the firmware
version of the instrument.
Not modifiable field.
Normally closed (N.C.) (default setting)
deenergized relay,
disconnected load (used contacts: C, NA)
excited relay,
connected load (used contacts: C, NA)
Normally open (N.O.)
excited relay,
disconnected load (used contacts: C, NC)
deenergized relay,
connected load (used contacts: C, NC)
It allows to change the priority of relays outputs, that is to say the order with whom the loads are connected
and disconnected in case of surplus of power.
If not modified the priority is the following:
OUT1 = P1 (the most priority output , that is to say the one which will be connected for first if the surplus of
produced power is higher than the Setpoint).
OUT2 = P2
OUT3 = P3
Attention: if by pressing the keys or you can’t go to the next menu (backlighting) or to the previous
menu (relays logic) its probable that the same priority P has been assigned to two different outputs OUT.
Correct by assigning different priorities to the three outputs.
It allows to set the backlighting:
TIME = backlighting on
for 60 seconds
from the pressure
of one key
• NO = backlighting
always off
YES = backlighting
always on


Specyfikacje produktu

Marka: Vemer
Kategoria: Niesklasyfikowane
Model: SOLAR-3

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Vemer SOLAR-3, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Vemer

Vemer

Vemer PR-1DA Instrukcja

4 Października 2024
Vemer

Vemer TCR Instrukcja

3 Października 2024
Vemer

Vemer Set PC RF8 Instrukcja

1 Października 2024
Vemer

Vemer ADR-D Vision Instrukcja

22 Września 2024
Vemer

Vemer Athena.Temp Instrukcja

22 Września 2024
Vemer

Vemer FR NTC-4P3D Instrukcja

21 Września 2024
Vemer

Vemer HT NiPt-2P3A Instrukcja

21 Września 2024
Vemer

Vemer LSM-01 Instrukcja

18 Września 2024
Vemer

Vemer Phono Instrukcja

16 Września 2024

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

Stihl

Stihl HT 70 Instrukcja

15 Października 2024
Ernesto

Ernesto H14270 Instrukcja

15 Października 2024
Uniden

Uniden BT MIC KIT Instrukcja

15 Października 2024
Vaude

Vaude Omnis Bike 26 Instrukcja

15 Października 2024
ART

ART ProChannel II Instrukcja

15 Października 2024
Aukey

Aukey DR02J Instrukcja

15 Października 2024
Master Lock

Master Lock 653EURD Instrukcja

15 Października 2024
Roland

Roland FR-18 Diatonic Instrukcja

15 Października 2024