Instrukcja obsługi VDO 190-903

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla VDO 190-903 (2 stron) w kategorii Sprzęt pomiarowy. Ta instrukcja była pomocna dla 2 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/2
Ammeter
Installation Instructions
Instruction Sheet #0 515 012 154
Rev. 10/09
INSTRUCTIONS FOR THE INSTALLATION OF THE AMMETER ARE CONTAINED HEREIN.
USE IS RESTRICTED TO 12-VOLT NEGATIVE GROUND ELECTRICAL SYSTEMS. LIGHT
BULB, IF SUPPLIED, IS 12 VOLT.
S i e m VDO
Tools and Materials Needed For Installation:
10 Gauge stranded, insulated wire
Ring terminals
Non-insulated ¼" spade connectors
2¹⁄₁" hole saw
Drill and drill bit set
Half-round file
Tape measure or ruler
Small tools: wrench or nut driver, utility
knife, pliers, etc.
Ammeter Installation:
To Begin, go to #
BEGIN HERE
1. Select the location where you will mount
the gauge, and mark a center point.
1. Run a series of wires from the ammeter
location through the firewall to:
a) the positive (+) terminal on
the alternator;
b) the positive (+) terminal on
the starter;
Wiring the Ammeter:
Ù
[text continues at # Ë]
The bezel diameter is only a few mil-
limeters larger than the gauge itself.
With that in mind, measure and pre-
cisely mark the gauge location be-
fore cutting any holes!
CAUTION!!!
2. Cut a 2¹⁄₁₆" (52 mm) diameter hole for
the gauge. Make sure the hole is no larger
than 2 ¹⁄₁₆" (52 mm). If the gauge is too
snug, use a file to slightly enlarge the open-
ing. (Diagram A)
3. Slip the mounting bracket over the
mounting bolts on the back of the gauge.
Screw on the accompanying nuts. Tighten
the nuts until the ammeter can no longer
be rotated by hand. (Diagram B)
DO NOT OVERTIGHTEN.
Item Description Quantity
1. Ammeter (2 ¹⁄₁" [52 mm] diameter) 1
2. Lamp Socket (Push in, wedge-type) 1
3. Light Bulb (12-volt / G.E. #158 or equivalent) 1
4. VDO Mounting Bracket and nuts (2) 1
5. Installation Instructions 1
Parts List
Diagram D
Proper wiring of the VDO Ammeter
/ %
9W^YdY_^CgYdSXUT!"f
<_QT
CdQbdUb1\dUb^Qd_b 7b_e^T
2QddUbi
1]]UdUb 6ecU2_h
<YWXd
CgYdSX
Note: We recommend this instrument be
installed by a trained professional.
CAUTION:
Read these instructions
thoroughly before making installation.
Do not deviate from assembly or wiring
instructions. Always disconnect battery
ground before making any electrical
connections. If in doubt, please contact
your dealer or VDO at 1-800-265-1818.
CONTINUE HERE
Diagram A
Gauge dimensions
Diagram B
Proper mounting of the VDO Ammeter
c) the positive (+) terminal on
the ignition switch.
2. Connect the wires from the alternator,
starter and ignition to the terminals on the
back of the ammeter as shown in Diagram
C.
At this point, the installation and wiring
of your ammeter is complete. Turn on the
ignition and start the engine to be sure the
ammeter is working properly. If it isnt, re-
check your wiring.
3. Connect the wire from the light switch
(after the fuse box) and from a ground lo-
cation to the ammeter light switch termi-
nals, also as shown in Diagram C.
PD[   PP
  PP
é  PP
 PP

 PP

Specyfikacje produktu

Marka: VDO
Kategoria: Sprzęt pomiarowy
Model: 190-903

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z VDO 190-903, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Sprzęt pomiarowy VDO

VDO

VDO 190-903 Instrukcja

18 Września 2024

Instrukcje Sprzęt pomiarowy

Najnowsze instrukcje dla Sprzęt pomiarowy

Stamos

Stamos S-LS-28 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-86 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-61 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-81 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-84 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-74 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-76 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-42 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-75 Instrukcja

15 Października 2024
Stamos

Stamos S-LS-35 Instrukcja

15 Października 2024