Instrukcja obsługi Sungrow SH3.0RS


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Sungrow SH3.0RS (77 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 6 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/77
TRF No. IEC62109_1B
TEST REPORT
IEC 62109-1
Safety of Power Converter for use in Photovoltaic Power Systems
Part 1: General requirements
Report Number. ............................ : 70.409.21.035.11-00 part 1 of 3
Date of issue ................................. : 2021-05-17
Total number of pages ................. : 77
Testing Laboratory ...................... : TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou
Branch
Applicant’s name .......................... : Sungrow Power Supply Co., Ltd.
Address......................................... : No. 1699 Xiyou Road, New & High, Technology Industrial
Development Zone, 230088 Hefei, Anhui, People’s Republic of
China
Test specification:
Standard ....................................... : IEC 62109-1:2010 (First Edition)
Test procedure ............................. : TÜV mark
Non-standard test method ........... : N/A
Test Report Form No. ................... : IEC62109_1B
Test Report Form(s) Originator.... : VDE Testing and Certification Institute
Master TRF.................................... : Dated 2016-04
Copyright © 2016 IEC System of Conformity Assessment Schemes for Electrotechnical Equipment
and Components (IECEE System). All rights reserved.
This publication may be reproduced in whole or in part for non-commercial purposes as long as the IECEE is acknowledged as
copyright owner and source of the material. IECEE takes no responsibility for and will not assume liability for damages resulting from
the reader's interpretation of the reproduced material due to its placement and context.
This report is not valid as a CB Test Report unless signed by an approved CB Testing Laboratory
and appended to a CB Test Certificate issued by an NCB in accordance with IECEE 02.
General disclaimer:
The test results presented in this report relate only to the object tested.
This report shall not be reproduced, except in full, without the written approval of the Issuing CB Testing
Laboratory. The authenticity of this Test Report and its contents can be verified by contacting the NCB,
responsible for this Test Report.
Page 2 of 77
Report No. 70.409.21.035.11-00 part 1 of 3
TRF No. IEC62109_1B
Test item description ...................... : Grid-connected Hybrid Inverter
Trade Mark ....................................... :
Manufacturer ................................... : Sungrow Power Supply Co., Ltd.
No. 1699 Xiyou Road, New & High, Technology Industrial
Development Zone, 230088 Hefei, Anhui, Peoples Republic of
China
Model/Type reference ...................... : SH3.0RS, SH3.6RS,SH4.0RS, SH5.0RS, SH6.0RS
Ratings............................................. : See rating labels on page 4 to 6
Responsible Testing Laboratory (as applicable), testing procedure and testing location(s):
Testing Laboratory ………………..: TÜV SÜD Certification and Testing (China) Co., Ltd.
Guangzhou Branch
Address ....................................................... : 5F, Communication Building, 163 Pingyun Rd, Huangpu
Ave. West, Guangzhou 510656, P. R. China
Associated Testing Laboratory:
Testing location/ address ........................... :
Tested by (name, function, signature)........ :
Approved by (name, function, signature)... :
Testing procedure: CTF Stage 1: Test Center of Sungrow Power Supply Co., Ltd. (CNAS
L8066)
Testing location/ address ........................... : No. 1699 Xiyou Road, New & High, Technology Industrial
Development Zone, 230088 Hefei, Anhui, Peoples
Republic of China
Tested by (name, function, signature)........ : Shan Huang
Bin Wu
Approved by (name, function, signature)... : Kai Zhao
Testing procedure: CTF Stage 2:
Testing location/ address ........................... :
Tested by (name + signature) ..................... :
Witnessed by (name, function, signature) . :
Approved by (name, function, signature)... :
Testing procedure: CTF Stage 3:
Testing procedure: CTF Stage 4:
Testing location/ address ........................... :
Tested by (name, function, signature)........ :
Witnessed by (name, function, signature) . :
Approved by (name, function, signature)... :
Supervised by (name, function, signature) :
Page 3 of 77
Report No. 70.409.21.035.11-00 part 1 of 3
TRF No. IEC62109_1B
List of Attachments (including a total number of pages in each attachment):
Tests against:
IEC 62109-1(ed.1)/EN 62109-1:2010, IEC 62109-2(ed.1)/EN 62109-2:2011
Total test reports contains 2 parts and 3 attachments listed in below table:
Item Description Pages
Part 1 IEC 62109-1(ed.1)/EN 62109-1:2010 test report 77
Part 2 IEC 62109-2(ed.1)/EN 62109-2:2011 test report 30
Part 3 IEC 62477-1:2012+A1:2016, EN 62477-1:2012/A1:2017 test report 67
Attachment 1 Data form for electrical and electronic component (CDF) 13
Summary of testing:
All the tests results are confirmed to the requirements of the standard.
Tests performed (name of test and test clause):
Visual inspection - clauses as available;
Mains supply electrical data in normal condition &
electrical ratings tests - 4.2.2.6 & 4.7;
Durability and legibility of marking - 5.1.2;
Thermal test and single fault test - 4.3 & 4.4;
Humidity preconditioning - 4.5;
Voltage Back-feed Protection, as combined with 4,4;
Enclosure integrity - 6.3;
Non-accessibility - 7.3.4.2.3;
Protective bonding - 7.3.6.3.3;
Capacitor discharge - 7.3.5.3.2 & 7.3.9;
Clearance and creepage distances - 7.3.7;
Capacitor discharge - 7.3.9 & 7.4;
Energy hazards - 7.4;
Electrical tests - 7.5;
Stability test - 8.3;
Handle loading - 8.4;
Support loading - 8.5;
Material tests - 9.1.3;
Limited power sources - 9.2;
Sonic pressure hazards - 10;
Actuating parts of controls (Knob pull and limitation of
movement) - 13.1
Physical tests on power supply cords - 13.3.2.5
8 mm stripping test - 13.3.3.6;
Mould stress relief test - 13.6.2.1;
Deformation tests - 13.7;
Battery - 14.8;
Annex B operational test as combined with 4,4;
Remark: Touch current test was conducted at nominal
frequency 60Hz(considered more severity), and other
tests were conducted at nom
inal frequency 50Hz
,
230
VAC
Testing location:
1. Test Center of Sungrow Power Supply
Co., Ltd.
No. 1699 Xiyou Road, New & High,
Technology Industrial Development Zone,
230088 Hefei, Anhui, Peoples Republic of
China.
Summary of compliance with National Differences (List of countries addressed):
All tests were carried out according to IEC 62109-1(ed.1)/EN 62109-1:2010.
The text of IEC 62109-1(ed.1) was approved by CENELEC as a European Standard without any
modification. Also compliance with EN 62109-1:2010, Annex ZA of EN 62109-1:2010 is recorded at the end
of this report.
The product fulfils the requirements of IEC 62109-1(ed.1)/EN 62109-1:2010


Specyfikacje produktu

Marka: Sungrow
Kategoria: Niesklasyfikowane
Model: SH3.0RS

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Sungrow SH3.0RS, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Sungrow

Sungrow

Sungrow SSS1600S Instrukcja

7 Października 2024
Sungrow

Sungrow S2000S-SA Instrukcja

7 Października 2024
Sungrow

Sungrow S800S Instrukcja

7 Października 2024
Sungrow

Sungrow SG4400UD-20 Instrukcja

30 Września 2024
Sungrow

Sungrow SG4400UD-MV Instrukcja

30 Września 2024
Sungrow

Sungrow SG4400UD Instrukcja

30 Września 2024
Sungrow

Sungrow SG350HX-US Instrukcja

30 Września 2024
Sungrow

Sungrow SH10RT Instrukcja

30 Września 2024
Sungrow

Sungrow SG3300UD Instrukcja

30 Września 2024

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

Stihl

Stihl HT 70 Instrukcja

15 Października 2024
Ernesto

Ernesto H14270 Instrukcja

15 Października 2024
Uniden

Uniden BT MIC KIT Instrukcja

15 Października 2024
Vaude

Vaude Omnis Bike 26 Instrukcja

15 Października 2024
ART

ART ProChannel II Instrukcja

15 Października 2024
Aukey

Aukey DR02J Instrukcja

15 Października 2024
Master Lock

Master Lock 653EURD Instrukcja

15 Października 2024
Roland

Roland FR-18 Diatonic Instrukcja

15 Października 2024