Instrukcja obsługi Soyosource GTN-1200G48-2-RS

Soyosource Ładowarka baterii GTN-1200G48-2-RS

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Soyosource GTN-1200G48-2-RS (12 stron) w kategorii Ładowarka baterii. Ta instrukcja była pomocna dla 5 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/12
M u l t i p u r p o s e G r i d T i e P o w e r I n v e r t e r
http://www.new-pv.comhttp://www.new-pv.com
GTN GTW 1000W 1200W & /
Installation and operation manual
1
1.Manual description
1 1. product description---------------------------------------------2
2.Safety instructions and specifications
2 1. Terms of Use------------------------------------------------3
2 2. Model naming-----------------------------------------------3
3.Installation procedure
3 1. Installation to suitable place -----------------------------------4
3 2. Inverter installation -----------------------------------------4
---------------------------------54.1 Connection cable requirements
4.2 AC connection description ------------------------------------6
4. Electrical connection and commissioning
5. LCD display operation and content description
5 1. LCD main interface display content description -----------------------7
5 2. LCD anomalies prompt Description ------------------------------7
. 6Main technical arameters ata heet ppendix 000W odel p d s A -A 1 m
. 8Component connection diagram
8 1 .Two serial and two parallel connections -----------------------------10
8 2 .Four serial connections ---------------- --------------------------------------11
Packing List -----------------------------------------------------10
Table of ontents C
1 2 . Packaging inspection -----------------------------------------2
2. 3Grid Tie inverter features------------------------------------3
4.3 DC terminal connection instructions ------------------------------6
4.4 Trial run ----------------------- -------------------------------6
5. 3Button setting operation instructions -----------------------------8
5 4. Main setting interface content description -------------------------8
5 5. Battery grid connection parameter setting instructions ---------------8
-------9
7. Main technical arameters ata heet ppendix 200W odel p d s A -B 1 m
-------9
8.3 Two serial and two parallel connect panels charging the battery ------------11
Disclaimer and copyright notice ------------------------------------10
2
product description
technology which has the same ability to serial and parallel connect multiple components in,
series with a centralized inverter while also having a distributed micro inverter Small size and , -
high efficiency built in innovative speed enhanced maximum power point tracking MPPT , - - ( )
control algorithm integrated LCD function display and LED status display The whole machine , .
uses a number of patented designs with high circuit integration reliable performance , , ,
comprehensive optimization of the heat dissipation system compatibility with various types of ,
photovoltaic panel components easy to operate and install ,
The grid connected inverter can be applied to such as various types of photovoltaic modules - ( ,
various types of batteries DC switching power supplies DC motors etc in the grid feed system , , , .)
or power supply type of load discharge aging test and other systems In the photovoltaic grid , . -
connected inverter the solar panel assembly can maximize the power output built in precision , ( -
MPPT convert the output energy of the solar panel assembly to the grid or use other switching), ,
power supplies and battery discharge tests Contact us for technical information . .
1 2 Packaging inspection.
Although we have carefully tested and tested the grid connected inverter before -
transportation it is inevitable that damage may occur during transportation so please check it, ,
carefully before installation If any damage is detected please contact the shipping company or . ,
contact us directly Please provide a photo of the damage we will provide you with the fastest . ,
and best service .
2 Safety instructions and specifications
Please read this manual carefully before installation and operation If the equipment is damaged .
due to failure to install and operate according to the instructions in this manual the company ,
reserves the right not to provide warranty free service - .
The GTW N 1000W 1200W grid tied inverter uses innovative grid connected inverter & - / - -
2.1 Specifications
a. Normal safe operation of the inverter requires proper transportation, storage, installation
and connection, as well as operation and maintenance.
b. All operations and wiring should be performed by professional mechanical and electrical
engineers, and all electrical installations must comply with local electrical installation standards.
c. Before installing or wiring, be sure to measure the DC side and AC side voltage of the device
with a voltmeter to ensure that the DC side and AC side are operated without voltage.
d. Follow all instructions for hazard, warning, and safety information in accordance with the
operating and installation instructions.
1 1 .
1. Manual description
Connection diagram
Solar Array Grid tie inverter Electricity meter Grid


Specyfikacje produktu

Marka: Soyosource
Kategoria: Ładowarka baterii
Model: GTN-1200G48-2-RS

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Soyosource GTN-1200G48-2-RS, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Ładowarka baterii Soyosource

Instrukcje Ładowarka baterii

Najnowsze instrukcje dla Ładowarka baterii

MSW

MSW S-CHARGER-20A.2 Instrukcja

15 Października 2024
MSW

MSW S-CHARGER-10A.2 Instrukcja

15 Października 2024
Intenso

Intenso Powerbank 10400 Instrukcja

14 Października 2024
Gembird

Gembird CHM-03 Instrukcja

10 Października 2024
Kostal

Kostal IQ 8.5 Instrukcja

9 Października 2024
Venom

Venom VS5007 Instrukcja

9 Października 2024
Venom

Venom VS5010 Instrukcja

9 Października 2024
Venom

Venom VS2891 Instrukcja

9 Października 2024
Venom

Venom VS2881 Instrukcja

9 Października 2024
Venom

Venom VS2883 Instrukcja

9 Października 2024