What’s in the Package
SolarEdge Home Battery
Low Voltage
Used with SolarEdge inverters
Quick Installation and Operation Guide
for Europe
Ordered Separately
WARNING!
WARNING!
WARNING!
WARNING!WARNING!
Before installing or operating the SolarEdge Home Battery, read the Safety and Handling instructions at the back of this page.
Drill
Min 2 qualified installers
Level
Phillips
screwdriver
WARNING!
WARNING!
WARNING!
WARNING!WARNING!
This symbol denotes a hazard. It calls attention to a procedure that if not correctly performed or adhered to could result in injury or loss of life.
Do not proceed beyond a warning note until the indicated conditions are fully understood and met.
© SolarEdge Technologies, Ltd.
All rights reserved.
Version: 1.0, August 2022
Subject to change without notice.
Support Contact Informat
Support Contact Informat
Support Contact Informat
Support Contact InformatSupport Contact Information
ion
ion
ionion
In case of any technical issues with SolarEdge
products, please contact us at:
https://www.solaredge.com/service/support
Emergency Response
guide, including emergency
phone numbers
Safety
Datasheet
1
Floor Stand
Flat Blade -
screwdriver
18 mm Wrench
SolarEdge Home Battery Mounting Bracket
and Screws
WARNING!
Make sure that the circuit
breakers of the battery are
in the OFF position and all
LEDs are turned off
Hammer
Pencil Wire Cutter
Mounting screws and
studs - Mmax 10
min 2
54.7KG
Wiring
video
Unpacking and
mounting video
Battery
Datasheet
Battery Installation
Manual
Turning off the Battery Power
LEDs
1
2
OFF
ON
Battery Top Cover
3
4
Floor Stand Positioning and Leveling
1 2
3 4
Installing the Mounting Bracket
2.5 Nm
3- cm5
23
1WARNING!
Mount the battery on a stable surface
NOTE:
NOTE:
NOTE:
NOTE: NOTE: Use a minimum of two wall screws to
install the bracket. Use additional screws to
reinforce installation according to wall
condition.
Planning and Considerations
WARNING!
WARNING!
WARNING!
WARNING! WARNING! Connect no more than 5 batteries per inverter.
Use no more than 3 batteries per battery tower.
30 50 - cm
H: 54 cm
D: 24 cm
W: 50 cm
30 cm
30 cm
Max 500 cm
25 cm
EMERGNCY EXIT
20 cm
2
Inverter
100 cm
Tools and Materials Required
Personnel
NOTE:
NOTE:
NOTE:
NOTE: NOTE: Before installing batteries on top of each
other, checked that the max tilt of the wall is 1.5%
Battery to
inverter
Tower to
Tower
Battery to
Battery
260 cm260 cm57cmDC cables
260 cm170 cm55cmGround cable
260 cm170 cm57cmCommunication cable
Available Cables
7
6
SA
SA
SA
SASAFET
FET
FET
FETFETY AN
Y AN
Y AN
Y ANY AND HA
D HA
D HA
D HAD HANDLING I
NDLING I
NDLING I
NDLING INDLING INST
NST
NST
NSTNSTRUCT
RUCT
RUCT
RUCTRUCTIONS
IONS
IONS
IONSIONS
Read this entire document before installing or operating the SolarEdge Home Battery (referred to as the
Battery ). Failure to do so or to follow any of the instructions or warnings in this document can result in
electrical shock, serious injury, or death, or may damage the Battery and other property.
Do not discard this document! After installation, keep it adjacent to the Battery for future reference!
Installation
Install the battery according to national and local codes and standards and in locations compliant
with local building codes and standards.
The Battery installation must be carried out only by qualified electricians who have been trained in
handling low voltage electricity works.
The Battery is heavy. Adhere to local regulations for material handling and heavy lifting, when
installing heavy equipment.
Do not install the Battery in habitable spaces, including sleeping rooms.
Make sure the mounting surface can sustain the total weight of the Battery and mounting bracket.
Do not install the Battery, if it has been dropped, crushed, or has signs of physical damage.
When the Battery is installed in a residential environment, fire detection and protection equipment
must be installed in accordance with local building and fire codes.
Do not install the Battery near heating equipment, ignition sources, or open flames.
Install the Battery only on non-combustible surfaces and under non-combustible ceilings, overhangs,
or eaves.
Do not install the Battery in proximity to gas meters, valves, regulators, lines, or gas appliances.
Follow local codes. However, 2m / 6ft or more spacing is highly recommended. A failing battery may
ignite flammable gasses resulting in property damage, serious injury, or death.
Avoid installing the Battery in direct sunlight.
Install the Battery in a location protected from flooding.
Do not install the Battery in the vicinity of water sources, including downspouts, sprinklers, or faucets.
When installing the Battery in a garage or near vehicles, keep it out of the driving path. If possible,
install the Battery on a side wall and/or above the height of vehicle bumpers.
Before beginning the wiring, ensure that the Battery is switched off. Also, make sure that the
DC safety switch of all inverters in the PV system is turned off.
Operation
The Battery contains rechargeable lithium-ion cells that are potentially hazardous and can present a
serious fire hazard, injury and/or property damage if damaged, defective or improperly used.
In case of an electrolyte leak from the Battery, avoid contact with electrolyte and follow the
instructions in the
SolarEdge Home Battery Emergency Response Guide.
Emission Compliance
Changes or modifications not expressly approved by SolarEdge for compliance may void the user’s
authority to operate the Battery.
Use the Battery only as directed in this document.
Do not use the Battery if it is defective, appears cracked, broken, or otherwise damaged, or fails to
operate.
The Battery and its components are not user-serviceable.
Do not attempt to open, disassemble, repair, tamper with, or modify the Battery. The Battery cells are
not replaceable.
Do not operate the Battery at ambient temperatures of above 50 122 10°C/ ° -F or below ° °F. C/14
Operating the Battery in temperatures outside the specified range might cause damage to the
Battery.
Do not expose the Battery or its components to direct flame.
Do not store or use flammable liquids or gasses in the vicinity of the Battery.
Do not place any combustible items in the vicinity of the Battery.
If the Battery catches fire, or if fire breaks out near the Battery, call the fire department immediately
and follow the instructions in the
SolarEdge Home Battery Emergency Response Guide.
The Battery is prone to re-ignition after extinguishing. Use caution and follow the emergency
response instructions.
Do not immerse the Battery or its components in water or other fluids.
Charge and discharge voltage: 44.8 56.5 - Vdc.
Do not use solvents to clean the Battery or expose the Battery to flammable or harsh chemicals or
vapors.
Do not use fluids, parts, or accessories other than those specified in this guide, including use of non-
genuine SolarEdge parts or accessories, or parts or accessories not purchased directly from
SolarEdge or a SolarEdge certified party.
After the installation, do not place the Battery in storage conditions for more than one (1) month, or
permit the power feed to the Battery to be discontinued for more than one (1) month.
Do not paint any part of the Battery, including any internal or external components such as the
exterior shell or casing.
Ensure that snow does not accumulate around the Battery.
A non-functioning Battery must be handled with caution. The Battery state of charge and risk of
venting may be unknown. Contact SolarEdge for assistance.
Do not attempt to remove or transport a damaged or non-functioning battery. Contact SolarEdge or
your SolarEdge certified installer for support.
This symbol on the product means: Do not dispose of this product with general household
waste. Consult your local regulations for proper disposal instructions.
LED Indications
SetApp
Configuring Installation
1. Hold the Reset button pressed for 3 to 6 seconds till
the LEDs blink.
2. Turn on the circuit breakers of the battery.
3. Run SetApp.
4. Scan the QR code on the inverter.
5. Follow the on-screen instructions.
For post-installation settings, see
Connection and Configuration
Connection and Configuration
Connection and Configuration
Connection and ConfigurationConnection and Configuration
application note.
NOTE: The battery operation is managed
by the SolarEdge inverter connected
to the battery.
Max ca
Communication Cable
+ -
1 3
4
5
Battery Capacity:
76 100- %
51 75- %
26 50- %
0-25%
Fault Indicator
Operation Indicator: Steady Charging
Flashing Discharging
Reset Button
Wiring
8
4
INV
1
- Battery Cable (Black)
+Battery Cable (Red)
Ground Cable (Yellow/green)
ON
2
Installing the
Battery Top
Cover
IMPORTANT! For detailed LED
indications and button operation,
refer the Battery Installation Manual
3 to 6 Sec
Commissioning
Commissioning
Commissioning
CommissioningCommissioning
CAN
Add New Devices
Power Mode
Finish Settings
Self Test
5
OFF
Optional
Inverter
BAT+BAT-
BAT+
BAT-
23
WARNING!
WARNING!
WARNING!
WARNING! WARNING! Connect a ground cable according to local regulation.


Specyfikacje produktu

Marka: SolarEdge
Kategoria: Akumulator
Model: IAC-RBAT-5KCINV-01

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z SolarEdge IAC-RBAT-5KCINV-01, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Akumulator SolarEdge

Instrukcje Akumulator

Najnowsze instrukcje dla Akumulator