Instrukcja obsługi Prem-i-air EH1419


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Prem-i-air EH1419 (12 stron) w kategorii klimatyzacja. Ta instrukcja była pomocna dla 4 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/12
Page 1
EH1419
7.3 kW (25000 BTU/hour)
Mobile Industrial Spot Cooler
Spot Cooling
LED display panel
4 Hour timer
Page 2
IMPORTANT
Installer and Users please note:
These instructions should be read carefully and left with the
user of the product for future reference.
BEFORE USE
Inspect the product including its cable and plug for any signs
of damage. If the product is damaged, DO NOT use it, and
contact your supplier immediately. The appliance contains a
refrigerant gas, so must be kept upright at all times. After
unpacking wait 3 hours for the refrigerant gas to stabilise
before use.
INSTALLATION
Attach the two handles to the rear
panel of the appliance. Remove the
four screws from the top left and right
sides of the rear panel.
Use the screws to fix the handles to
the rear panel.
The handles allow the appliance to
be moved more easily, and prevent it
from being damaged.
Attach the flexible tubes to the
apertures on the front panel of the
appliance, using the M5 countersunk
screws provided.
The EH1419 will operate with the
greatest efficiency if it is situated
outside the area to be cooled, and
the cold air ducted in using the two
flexible tubes.
Page 3
Stand the EH1419 on a firm, flat, level surface, and apply the
brakes to the rear castors.
For industrial spot cooling, no hot air ducting is required.For
zone cooling use 18" (457 mm) ducting. Never use reducers,
as they cause the exhaust air to be compressed, generating
heat, reducing efficiency, and reducing the output of cooled
air.
The appliance collects condensed water in the tank, so the
exhaust air is dry, and may be vented into a false ceiling.
GENERAL SAFETY REQUIREMENTS
Domestic wiring must be tested periodically by a qualified
electrician at least once every 10 years or at every change of
occupancy.
For office and retail premises, and buildings such as village
halls, the wiring must be inspected at least once every 5
years.
It is recommended that all building be fitted with smoke
alarms (it is mandatory for new buildings).
PAT TESTING.
When used in an office or commercial environment, this
product must be safety-tested yearly by a qualified electrician
(PAT Tested) in order to comply with the Electricity at Work
Regulations. If hired out, it should be PAT tested before
every hire.
We recommend that it is PAT tested regularly when used in
a domestic environment.


Specyfikacje produktu

Marka: Prem-i-air
Kategoria: klimatyzacja
Model: EH1419

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Prem-i-air EH1419, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje klimatyzacja Prem-i-air

Prem-i-air

Prem-i-air EH1413 Instrukcja

17 Września 2024
Prem-i-air

Prem-i-air EH0535 Instrukcja

16 Września 2024
Prem-i-air

Prem-i-air EH0533 Instrukcja

16 Września 2024
Prem-i-air

Prem-i-air EH1419 Instrukcja

16 Września 2024
Prem-i-air

Prem-i-air EH0554 Instrukcja

16 Września 2024
Prem-i-air

Prem-i-air EH1614 Instrukcja

15 Września 2024

Instrukcje klimatyzacja

Najnowsze instrukcje dla klimatyzacja

LG

LG HS-H076QPA0 Instrukcja

15 Października 2024
Klarstein

Klarstein Vita Pure 2G Instrukcja

15 Października 2024
Gree

Gree ETAC-15HP265V20B Instrukcja

15 Października 2024
Qlima

Qlima P 126 Instrukcja

14 Października 2024
Mitsubishi

Mitsubishi MSZ-CB22VA Instrukcja

14 Października 2024
Suntec

Suntec Motion 90+ Instrukcja

14 Października 2024
Danby

Danby DTAC120B1WDB Instrukcja

14 Października 2024
Amana

Amana PTC093K35AXXX Instrukcja

14 Października 2024
Amana

Amana AMAP121AB-2 Instrukcja

14 Października 2024