Instrukcja obsługi Oliveri BA118500CR
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Oliveri BA118500CR (4 stron) w kategorii Dźwig. Ta instrukcja była pomocna dla 5 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek
Strona 1/4
Before attempting any work involving mains water supply lines, ensure the water supply is shut off.
Stop valves (preferably with filters) must be used when installing your Oliveri mixer to allow isolation. (not
supplied with mixer). Failure to do so where required will void warranty.
This mixer tap is already pre-assembled and tested. Do not disassemble, as this may void the warranty.
This mixer tap must be installed in accordance with these instructions.
MAX OPERATING PRESSURE: ..............................................................5 bar (500kPa)
RECOMMENDED OPERATION PRESSURE: ..........................................1.5-5 bar (150-500kPa)
MAX HOT WATER TEMPERATURE: .....................................................65°C
RECOMMENDED HOT WATER TEMPERATURE: ..................................50°C
Barcelona Basin mixer
BA118500CR/BA118506MB
Where water pressure exceeds 500kPa, a pressure reducing device is to be installed. Note that required
water pressure overnight can reach 150% of the daytime pressure.
CARE & MAINTENANCE
Clean with a soft cloth and warm soapy water as necessary - rinse and dry after cleaning. Under No Circumstances
should abrasive or acid based cleaning products be used
WARRANTY
This mixer tap is warranted to be free from manufacturing defects for a period of 15 Years 15 years for cartridge:
10 years for body, 5 years for seals, tails, fittings and aerators and 1 year for finish and labour, when used in a
domestic situation.
This warranty does not cover against normal wear and will be voided if the product is misused or
not installed in accordance with these instructions. Note: Fitting spout-attached devices, including water
filters, to this mixer will void warranty.
Our goods come with guarantees that cannot be excluded under the Australian Consumer Law. You are
entitled to a replacement or refund for a major failure and for compensation for any other reasonably
foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if the goods fail to
be of acceptable quality and the failure does not amount to a major failure.
SERVICE
If the problem represents a danger, or damage to property may occur, immediately shut off the water
supply. If the mixer tap requires servicing, please contact your plumber (preferably the one who installed
it). Most problems occur due to contaminated supply lines or water pressure exceeding 500KPa.
Unscrew and clean the spout aerator periodically - especially if you notice a drop in water pressure.
If the Plumber is satisfied that the problem is not due to poor installation, contact T2 Services Pty Ltd for
assistance on:
If a warranty service agent finds that the mixer tap is not at fault, T2 Services Pty Ltd reserves the right to
pass on any callout fee to the householder.
THIS MIXER TAP MUST BE INSTALLED BY A LICENSED PLUMBER IN
ACCORDANCE WITH LOCAL REGULATIONS
This Oliveri tap is manufactured to standard AS/NZS 3718.
Note: Ceramic Cartidges - Warranty claims will not be honoured where the ceramic cartridge has
malfunctioned due to the presence in the water supply of;
- Copper tube pieces, sand, dirt or stones
- Thread tape
- Other objects not normally present in potable water supplies.
- Do not remove the cartridge from the body as it has been pressure tested and tightened to a
specific torque.
Technical Data
Installation Instructions
BA118500CR/BA118506MB installation instructions.pdfIssue Date 15/02/2019 Revision Number: V1.0
Note: Installation of aerators containing flow regulators.
Upon re-installation, the aerator should be tightened with an aerator key to prevent removal by hand.
In the event this product is rendered obsolete and a replacement product is required, Oliveri Solutions Pty Ltd
reserves the right to supply a product of equal substitution at their discretion.
Ph: (07) 55960738
Fax: (07) 55273353
Email: oliveri@t2services.com.au
https: //oliveri.com.au/service-and-warranty
BA118500CR/BA118506MB installation instructions.pdf
Installation Instructions
Installation Instructions
To the consumer
C
D
E
F
G
Max 37
B
APlease ensure that the lines are flushed prior to installation as contaminates in the water can damage the
Ceramic Cartridge, flow regulator and also affect the performance of the Mixer.
Under No Circumstances should any abrasive, cream or acid based cleaning agents be used as these
types of cleaners will damage the finish, Cartridge, seals and aerators.
General Note: This product is to be installed by a licensed plumber,installation must comply with
AS/NZS 3500 and local plumbing codes
C
1. The Mixer is to only be cleaned with warm soapy water and a soft cloth.
10. Using Fixing Nut (G) tighten Mixer to mounting Surface.
11. Connect Mixer tails to Mains Water supply line.
12. Ensure the Mixer tails are not Kinked, Bent, stretched or twisted when assembling to the Mains Water
Supply. The Mixer Tail connection between the mixer and the Water supply must have a natural curve.
13. Ensure Mixer tails are not exposed to Abrasions, corrosive agents or alike.
14. It is recommended that In-Line filters be installed to ensure a cleaner flow of water to the mixer.
1. Remove product from packaging and check for damages, if the product is damaged do not install and
return to store of purchase.
2. The WELS compliant aerator has been pre-assembled into the mixer outlet. To comply with WELS the flow
regulator must remain in place.
3. Ensure Product is complete as per exploded drawing.
4. A single 35mm Hole is required in the mounting surface.
5. The maximum mounting surface thickness cannot exceed 37mm.
6. Ensuring bench sealing washer (A) is in place on base of Mixer Dress ring (B) firmly screw the Mixer tails
(C) into base of the Mixer being careful to avoid damage to the o’ring seals, the Mixer tails are colour coded,
Red for hot and Blue for cold, the mixer base inlet holes are stamped with ‘H’ for Hot and ‘C’ for cold.
8. Feed the Mixer tails (C) through the Mounting surface, each end alternatively and position the mixer on the
mounting surface ensuring the sealing washer (A) is positioned correctly in Mixer dress ring (B).
7. Screw threaded rod (D) into base of Mixer.
9. Slide Rubber Horse Shoe (E) onto threaded rod (D) followed by Metal Horse shoe Plate (F).
N.B The Mixer Tails should be positioned towards the user and the Fixing bolt to the back.
2.
Issue Date 15/02/2019 Revision Number: V1.0
Pressures & Temperatures
Maximum Hydrostatic Pressure – 500 kpa. (As per AS/NZS3500)
Note: AS/NZS 3500.1-2003 (Clause 3.3.4) states that “Provision shall be made to ensure that the
maximum static pressure at any outlet, other than a fire service outlet, within a building does not
exceed 500 kPa.
Note: Pressures above 500kPa can cause damage from water hammer, reduced life of appliances,
taps and fittings, and cause excessive noise in the system.
Minimum Hydrostatic Pressure – 100 kpa
The Maximum operating temperature for the Mixer Tap is 65 .
CRITICAL-TO THE INSTALLING
PLUMBER
Mixer tails have been pre-
assembled for your convenience.
Please ensure prior to installation
you pre-check the assembled mixer
tails to ensure they are firmly
tightened into the mixer base,and
re-check the mixer tails after
connection to the mains water
supply to ensure the mixer tail
assembly is water tight.
Braided stainless
steel flexible hoses
must be inspected
every 12 months for
warning signs of
failure including
bulging,rust spots,
wear,moisture,
snapped threads,
kinking,water staining,
general corrosion or
discolouration.
Mixer tails showing any
signs of the above
mentioned warning
signs must be replaced
immediately.
Specyfikacje produktu
Marka: | Oliveri |
Kategoria: | Dźwig |
Model: | BA118500CR |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Oliveri BA118500CR, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Dźwig Oliveri
7 Października 2024
7 Października 2024
3 Października 2024
3 Października 2024
3 Października 2024
3 Października 2024
2 Października 2024
2 Października 2024
2 Października 2024
2 Października 2024
Instrukcje Dźwig
- Dźwig Ikea
- Dźwig Teka
- Dźwig Smeg
- Dźwig Etna
- Dźwig Lamona
- Dźwig Berg
- Dźwig Nodor
- Dźwig Grohe
- Dźwig Axor
- Dźwig CDA
- Dźwig Delta
- Dźwig Franke
- Dźwig Inventum
- Dźwig Livarno Lux
- Dźwig Caple
- Dźwig Hansgrohe
- Dźwig Sussex
- Dźwig Deante
- Dźwig Miomare
- Dźwig BLANCO
- Dźwig Ernesto
- Dźwig Elba
- Dźwig Schütte
- Dźwig Elkay
- Dźwig Quooker
- Dźwig Lynx
- Dźwig Empire
- Dźwig Moen
- Dźwig Aloni
- Dźwig WillieJan
- Dźwig Everpure
- Dźwig Sani-Lav
- Dźwig Mizzo
- Dźwig Brauer
- Dźwig Fala
- Dźwig Neo
- Dźwig Lomazoo
- Dźwig American Standard
- Dźwig SaniSupreme
- Dźwig Vola
- Dźwig Zip
- Dźwig The Galley
- Dźwig Oras
- Dźwig Viidako
- Dźwig Curaqua
- Dźwig Waltec
- Dźwig Fantini
- Dźwig Rogerseller
- Dźwig Gessi
- Dźwig Graff
- Dźwig Zurn
Najnowsze instrukcje dla Dźwig
9 Października 2024
9 Października 2024
9 Października 2024
9 Października 2024
9 Października 2024
9 Października 2024
9 Października 2024
9 Października 2024
9 Października 2024
9 Października 2024