Instrukcja obsługi Impact VS-LCD400

Impact światło VS-LCD400

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Impact VS-LCD400 (16 stron) w kategorii światło. Ta instrukcja była pomocna dla 5 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/16
VS-LCD Series Flash
INSTRUCTIONS
2
Thank you for purchasing the Impact VS-LCD Series Studio Strobe. This
light incorporates numerous advanced features, and was designed to
provide many years of trouble-free service. Please read these operating
instructions and safety precautions carefully before operating this
equipment.
Features
• A tactile, “grippy” feel that resists slipping and shock damage
• Cushioned “touch-pad” function control buttons
• Liquid Crystal Display
• Five Stop Range – full power to 1/16th power in .10 f/stop increments
• Red Eye Reduction function
• “Auto Dump” excess power release circuitry
• User-replaceable ash tube
• Commonly available 1/8” mini plug ash sync input
• Universal IEC C13 type computer power cord
• 7˝ grid reector
• Voltage: 100-120V 5 0-6 0Hz
• Built-in optical slave
Power Requirements
This light is designed for use with 110 /120V AC power only, and is supplied with a
3-prong, grounded plug. Do not at tempt to defeat this safety feature. If necessary, use
only grounded extension cords rated for 10 amps or greater.
Warning
There are no user-serviceable parts inside the unit. Only qualied service engineers
should access the inside of the case (Danger – high voltage parts inside). Avoid damage
to both the ash tube and modeling lamp. If the modeling lamp becomes cracked or
damaged in any way, it should be replaced immediately. Do not use your ash unit in an
environment where moisture or ammable vapor is likely to come in contact with the unit.
Turn the power off and unplug the power cord when the unit is not in use. Always remove
the modeling lamp and replace the protective cap when transporting the unit. Avoid
strong light falling onto the slave cell as it will prevent efcient operation. If the strobe
blows a fuse, a replacement fuse can be inserted in the pull-out compartment on the
back of the unit. To ensure long life of the ash capacitors, the ash unit should be
powered up and red several times at least every two months.
3
Contents of carton
Carefully remove theash unit from the box. You should have the following:
• 110-120Vash unit with protective cap and ash tube installed
• 150W modeling lamp
• 7˝ grid reector • 11´ sync cable
• power cable • user manual
Mount on a stand
Select a stand or support system of suitable weight and dimensions to ensure stable
operation of the unit.
Install Reector & Modeling Lamp
Depress the latch above the protective cap. Rotate the cap counter-clockwise. Pull the
cap off and set aside. Install the modeling lamp by screwing it into the threaded socket.
CAUTION: Do not touch the lamp wi th your bare hands. Oil residue from your ngers can
cause the surface of the lamp to heat unevenly and explode. Use white cotton gloves or a
clean cloth . Install the reector where the protective cap was before. Align the three
pegs on the reector with the three slot s, press the reector in and rotate clockwise
until it locks in place.
Note: Take care when tting or removing reectors or softboxes to not damage the ash
tube assembly. The ash tube is very delicate. Always switch off the unit and disconnect
the power before tting or changing lamps, ash tubes, reectors or softboxes.
Preparing Your Flash for Use

Specyfikacje produktu

Marka: Impact
Kategoria: światło
Model: VS-LCD400

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Impact VS-LCD400, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje światło Impact

Impact

Impact Octa FF-OF4 Instrukcja

4 Października 2024
Impact

Impact FRC-RLSLB Instrukcja

4 Października 2024
Impact

Impact FFOF4-2KI Instrukcja

4 Października 2024
Impact

Impact FL-2-KII Instrukcja

4 Października 2024
Impact

Impact FF-SA4 Instrukcja

4 Października 2024
Impact

Impact Octacool-6 Instrukcja

4 Października 2024
Impact

Impact Octacool-9 Instrukcja

4 Października 2024
Impact

Impact ACDC-400-TTL Instrukcja

4 Października 2024
Impact

Impact VC-500WLN Instrukcja

4 Października 2024
Impact

Impact Venture TTL-600 Instrukcja

4 Października 2024

Instrukcje światło

Najnowsze instrukcje dla światło