Instrukcja obsługi Enertex KNX SmartMeter 85A

Enertex Niet gecategoriseerd KNX SmartMeter 85A

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Enertex KNX SmartMeter 85A (72 stron) w kategorii Niet gecategoriseerd. Ta instrukcja była pomocna dla 3 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/72
Manual and Configuration
KNX Smartmeter 85A (RT)
Advice
The contents of this document may not be wholly or partially, reproduced, transferred, distributed or stored in any form
without prior written approval by Enertex Bayern GmbH.®
Enerte is a registered trademark of Enertex Bayern GmbH. Other product- and company names mentioned herein®
can be names of trademark or registered trademarks of their respective owners.
This manual may be changed without notifications or notice and makes no claim to completeness or accuracy.
Enertex® Bayern GmbH Ebermannstädter Straße 8 - 91301 Forchheim - Deutschland - mail@enertex.de
Handbuch-KnxSmartmeter-85A-en-4.odt, 2021-09-01 Seite 2 von 72
Contents
Notes.............................................................................................................................................................. 3
Function........................................................................................................................................................ 4
Technical specifications.............................................................................................................................. 4
Assembly....................................................................................................................................................... 7
Connection diagram................................................................................................................................. 7
Assembly of the current sensors.............................................................................................................. 8
Commissioning............................................................................................................................................ 9
ETS-Application..........................................................................................................................................10
Specification........................................................................................................................................... 10
Data base file......................................................................................................................................... 10
Examples of settings.............................................................................................................................. 10
Example 1: Visualization of energy consumption..................................................................................................10
Example 2: Bidirectional Counter for Photovoltaics...............................................................................................16
Measurement quantities......................................................................................................................... 23
General Function Concepts...................................................................................................................25
Cyclical transmitting...............................................................................................................................................25
Transmit at Change................................................................................................................................................26
Bidirectional Counter..............................................................................................................................................26
Intermediate Counter..............................................................................................................................................27
Tariff Costs Counter...............................................................................................................................................28
Preset of a Counter................................................................................................................................................29
Message of limit values..........................................................................................................................................29
Recording on the SD card......................................................................................................................................30
Adjusting the real-time clock without bus access..................................................................................................31
Parameter............................................................................................................................................... 32
General...................................................................................................................................................................32
Measurement..........................................................................................................................................................34
Energy counter / Tariff cost counter.......................................................................................................................43
Tariff........................................................................................................................................................................51
Group Objects........................................................................................................................................ 54
Firmware update......................................................................................................................................... 72
Revision history.........................................................................................................................................73
Enertex® Bayern GmbH – Ebermannstädter Straße 8 - 91301 Forchheim - Deutschland - mail@enertex.de
Handbuch-KnxSmartmeter-85A-en-4.odt, 2021-09-01 Seite 3 von 72
Notes
Installation and assembly of electrical equipment must be carried out by qualified electri-
cians.
When connecting KNX/EIB interfaces specialist skills are required.
Ignoring the instructions can damage the device, as well a fire or other hazards can
arise.
These instructions are part of the product and must be left with the end user.
The manufacturer is not liable for costs or damages incurred by the user or third parties
through the use of the device, misuse or malfunction of the connection, malfunction of
the device or user equipment.
Opening the housing, other unauthorized alterations and or modifications to the device
will invalidate the warranty!
Only the current sensors, which are included, may be connected to the current sensor
inputs.
The manufacturer is not liable for improper use.
Enertex® Bayern GmbH – Ebermannstädter Straße 8 - 91301 Forchheim - Deutschland - mail@enertex.de

Specyfikacje produktu

Marka: Enertex
Kategoria: Niet gecategoriseerd
Model: KNX SmartMeter 85A

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Enertex KNX SmartMeter 85A, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niet gecategoriseerd Enertex

Instrukcje Niet gecategoriseerd

Najnowsze instrukcje dla Niet gecategoriseerd

Stihl

Stihl HT 70 Instrukcja

15 Października 2024
Ernesto

Ernesto H14270 Instrukcja

15 Października 2024
Uniden

Uniden BT MIC KIT Instrukcja

15 Października 2024
Vaude

Vaude Omnis Bike 26 Instrukcja

15 Października 2024
ART

ART ProChannel II Instrukcja

15 Października 2024
Aukey

Aukey DR02J Instrukcja

15 Października 2024
Master Lock

Master Lock 653EURD Instrukcja

15 Października 2024
Roland

Roland FR-18 Diatonic Instrukcja

15 Października 2024