Instrukcja obsługi Chief SLM215
Chief
akcesoria do projektorów
SLM215
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Chief SLM215 (1 stron) w kategorii akcesoria do projektorów. Ta instrukcja była pomocna dla 2 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek
Strona 1/1
I N S T A L L A T I O N I N S T R U C T I O N S
Milestone AV Technologies, Inc., and its affiliated corporations and subsidiaries (collectively, "Milestone"), intend to make this manual accurate and complete. However, Milestone
makes no claim that the information contained herein covers all details, conditions or variations, nor does it provide for every possible contingency in connection with the installation
or use of this product. The information contained in this document is subject to change without notice or obligation of any kind. Milestone makes no representation of warranty, ex-
pressed or implied, regarding the information contained herein. Milestone assumes no responsibility for accuracy, completeness or sufficiency of the information contained in this
document.
© 2008 Chief Manufacturing, 8401 Eagle Creek Parkway, Savage, MN 55378
• P: 800.582.6480 / 952.894.6280 • F:877.894.6918 / 952.894.6918
8850-000145 Rev.A
3/17/08
SLB-215 and SLM-215 Interface Brackets
for Sharp XV-Z90U, Sharp Vision Theago DT-200
SLB and SLM series Interface brackets are designed for use with Chief RPA, RPM, and Smart-Lift series projector mounts. See the specific
installation instructions provided with the mount for additional installation information.
Unpack carton and verify kit contents. If any listed parts are missing, immediately contact a Chief Customer Service representative by calling
1-800-582-6480.
WARNING: IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY AND
DAMAGE TO EQUIPMENT! DO NOT substitute hardware. Use only hardware supplied by manufacturer!
Installation:
WARNING: OVERTIGHTENING OF SCREWS CAN DAMAGE PARTS AND LEAD TO SERIOUS PERSONAL INJURY AND DAMAGE
TO EQUIPMENT! DO NOT over tighten screws when installing interface brackets.
NOTE: Step 1 is only required when installing an SLB Interface bracket. If an SLM bracket is being installed proceed to step 2.
1. Screw four thumb screws onto four 10-24 x 5/8" Philips pan head screws. DO NOT fully tighten thumb screws at this time.
2. Turn projector upside down on a flat surface.
3. Place the interface bracket onto the bottom of the projector lining up the four mounting holes in the bracket with the four threaded inserts
in the bottom of the projector.
4. Using the four M4 X 10mm mounting screws, start them into the mounting holes by hand and secure all four fasteners at this time.
NOTE: Security screws can be substituted when mounting Interface bracket to projector by using the parts and installation instructions in the
All-Points Security Kit.
(1) Interface Bracket (4) Washer, Flat, M4
(4) 10-24 Thumb Nuts ** (4) Screw, Pan head, M4 x 10mm
(1) All-Points Security Kit
**Only used when installing SLB Interface brackets.
SLB-215
SLM-215
Towards front of
Towards front of
Projector
Projector
Specyfikacje produktu
Marka: | Chief |
Kategoria: | akcesoria do projektorów |
Model: | SLM215 |
Kolor produktu: | Czarny |
Ilość na paczkę: | 1 szt. |
Waga wraz z opakowaniem: | 1000 g |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Chief SLM215, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje akcesoria do projektorów Chief
14 Lipca 2024
14 Lipca 2024
14 Lipca 2024
14 Lipca 2024
14 Lipca 2024
14 Lipca 2024
14 Lipca 2024
14 Lipca 2024
14 Lipca 2024
14 Lipca 2024
Instrukcje akcesoria do projektorów
- akcesoria do projektorów Sony
- akcesoria do projektorów My Wall
- akcesoria do projektorów Peerless-AV
- akcesoria do projektorów Vogel's
- akcesoria do projektorów Barco
- akcesoria do projektorów Gravity
- akcesoria do projektorów Newstar
- akcesoria do projektorów Christie
Najnowsze instrukcje dla akcesoria do projektorów
13 Września 2024
13 Września 2024
13 Września 2024
27 Sierpnia 2024
27 Sierpnia 2024
27 Sierpnia 2024
27 Sierpnia 2024
27 Sierpnia 2024
27 Sierpnia 2024
27 Sierpnia 2024