Instrukcja obsługi CDA KVC30LSS
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla CDA KVC30LSS (4 stron) w kategorii Zlew. Ta instrukcja była pomocna dla 2 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek
Strona 1/4
www.cda.eu
KVC30 and
KVC35 Stainless
Steel Undermount
Sinks
Installation
2
Installation
Before Installation
Thoroughly check the sink and any fittings for signs of damage
(transport or otherwise).
Please note: After fitting, sinks cannot be returned for credit or
replacement.
Oer up the sink to the worktop and/or the cabinets to confirm that
the external dimensions of the bowls are compatible with the cabinets
themselves.
Confirm that with the sink in position:
• There is adequate space to install any taps or other required
accessories.
• There is adequate space to install the waste pipe work and that any
necessary modifications to internal shelves to accommodate the
waste (and trap) are acceptable.
• Access to any water shut-o or other services will still be adequate
after the installation.
Installation
• Use the template provided to mark out where the worktop needs to
be cut. Double-check the dimensions, and check the template against
the sink, before cutting the worktop aperture.
• After cutting out the worktop aperture, we recommend you seal the
cut edges with silicone (or similar) sealant to help prevent ingress of
water.
• It is often easier to mount the taps to the worktop and the waste-fitting
and overflow onto the sink prior to fitting the sink to the worktop.
• The edges of the sink should be bedded onto a bead of silicone (or
similar) sealant, to create a barrier to the ingress of water and other
3
E & O E. All instructions, dimensions and illustrations are provided for guidance only. CDA reserve the
right to change specifications without prior notice.
items between sink and
worktop.
• After positioning the sink with the
worktop, fit the threaded inserts
into the underside of the worktop (a
10mm drill bit can be used to make
the holes for the threaded inserts)
and then position the brackets and
fixing screws as shown in Fig. 1. Next,
tighten the screws.
• Do not use a power tool to tighten the screws; use a hand tool
to ensure that they are tightened just enough to clamp down on
the worktop and no more.
• After fixing, ensure the sealant forms a continuous bead to prevent
water ingress.
• Remove any excess sealant using an appropriate method as
recommended by the sealant manufacturer.
• The taps, waste-fitting and overflow can now be mounted onto the
sink (if not already done) and fully connected to their respective
services.
• To check the waste for leaks, close the plug/basket of the waste
fitting, open the tap and fill the sink to the level of the overflow; turn
o the tap and wait several minutes to verify that the water doesn’t
drain away. Finally, empty the sink.
After fitting, ensure that the enclosed “Stainless Steel Sinks Use and
Maintenance” guide is retained for the customer and/or user of the
sink.
Fig. 1
Worktop
Sink
Threaded insert
Fixing screw
Bracket
Specyfikacje produktu
Marka: | CDA |
Kategoria: | Zlew |
Model: | KVC30LSS |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z CDA KVC30LSS, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Zlew CDA
16 Września 2024
16 Września 2024
16 Września 2024
15 Września 2024
14 Września 2024
13 Września 2024
12 Września 2024
12 Września 2024
12 Września 2024
12 Września 2024
Instrukcje Zlew
- Zlew Teka
- Zlew Smeg
- Zlew Hendi
- Zlew Concept
- Zlew Nodor
- Zlew Hotpoint Ariston
- Zlew Artusi
- Zlew Oliveri
- Zlew Bartscher
- Zlew Franke
- Zlew Caple
- Zlew Kernau
- Zlew Foster
- Zlew Deante
- Zlew BLANCO
- Zlew Atosa
- Zlew Rangemaster
- Zlew Gustavsberg
- Zlew Leisure
- Zlew Saro
- Zlew Elkay
- Zlew Schock
- Zlew Roca
- Zlew Advance Tabco
- Zlew Eagle Group
- Zlew Sani-Lav
- Zlew Laveo
- Zlew Tot Mate
- Zlew Kuchinox
- Zlew Shaws
- Zlew Seima
Najnowsze instrukcje dla Zlew
13 Stycznia 2025
12 Stycznia 2025
2 Stycznia 2025
1 Stycznia 2025
30 Grudnia 2025
27 Grudnia 2024
27 Grudnia 2024
27 Grudnia 2024
27 Grudnia 2024
27 Grudnia 2024