BOILER OPERATING AND INSTALLATION
INSTRUCTION MANUAL
BENEKOV S100
- 2 -
Dear client,
thank you for purchasing the automatic hot water wood pellet boiler
BENEKOV S100 and hence your confidence in BENEKOVterm s.r.o. of Horní
Benešov.
To get used to a correct way of handling your new product right from the
beginning, first read this operating manual, especially the chapter 7 and 8.
Please follow the information below and observe the instructions of the
manufacturer or the service company that installed your boiler.
This boiler was approved for operation in EU member states by
Strojírenský zkušební ústav, s.p. (Engineering Testing Institute, state-owned-
enterprise), Notified Body 1015, Authorized Body 202, Brno based on certificate
no. B-30-00613-16 of 31.5.2016.
In accordance with Government Regulation No. 176/2008 Coll., Annex 1,
section 1.7.4. it is an
ORIGINAL INSTRUCTION MANUAL.
Copyright 2011 Leopold Benda jr. et al., license BENEKOVterm spol. s.r.o.
All rights reserved.
All texts, images are subject to copyright and other intellectual property protection.
- 3 -
Table of Contents
1. Boiler use and advantages................................................................................................................. 4
2. Technical specifications......................................................................................................................4
3. Specified fuel...................................................................................................................................... 5
4. Boiler description................................................................................................................................ 6
4.1. Boiler design.................................................................................................................................... 6
4.2. Control and safety elements of the boiler...................................................................................... 13
4.3. Boiler accessories..........................................................................................................................13
5. Boiler placement and installation...................................................................................................... 14
5.1. Regulations and directives............................................................................................................. 14
5.2. Boiler placement options ............................................................................................................... 16
6. Commissioning of the boiler - instructions for contracted service organizations..............................18
6.1. Electrical connection via connectors..............................................................................................18
6.2. Connection of the boiler to the heating system.............................................................................. 19
6.3. Installation of ceramics into the boiler ........................................................................................... 20
6.4. Verification activities before start-up..............................................................................................21
6.5. Putting into operation..................................................................................................................... 22
7. Boiler operation by user.................................................................................................................... 22
7.1. Making fire in the boiler..................................................................................................................23
7.2. Boiler operation..............................................................................................................................23
7.3. Boiler shutdown............................................................................................................................. 23
7.4. Residual risks and their prevention................................................................................................24
8. Boiler maintenance........................................................................................................................... 25
9. Troubleshooting................................................................................................................................ 26
10. Guidelines for sustained compliance with the environmental parameters of the product ...............28
11. Instructions for product disposal after the end of its service life...................................................... 28
12. Guarantee and liability for defects ................................................................................................... 28


Specyfikacje produktu

Marka: Benekov
Kategoria: Bojler
Model: S100 Boiler

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Benekov S100 Boiler, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Bojler Benekov

Benekov

Benekov R26 Instrukcja

3 Września 2024
Benekov

Benekov R51 Instrukcja

2 Września 2024
Benekov

Benekov R16 Instrukcja

30 Sierpnia 2024

Instrukcje Bojler

Najnowsze instrukcje dla Bojler