Instrukcja obsługi ATTACK KLV
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla ATTACK KLV (28 stron) w kategorii Bojler. Ta instrukcja była pomocna dla 7 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek
Strona 1/28
ATTACK®
CAST IRON FLOOR STANDING GAS BOILER
EKO, PLQ, KLQ, KLV, E, EZ, P
INSTRUCTION FOR USE
WWW.ATTACK.SK
2 |
Putting the boiler into operation:
ATTACK EKO, PLQ, KLQ, KLV, E, EZ, P
Capacity of 9, 12, 15, 20, 25, 30, 35, 40, 45, 49,9 kW
1. Plug the connector of the power supply flex into the 230 V/50 Hz socket. Test the socket with
another appliance. The main switch of the boiler must be in the „off“ position.
2. Let the gas flow into the boiler by turning a manual valve. When starting operation after a
longer period of inactivity, it is necessary to deaerate the gas piping. Force the air out by gas
through the burner (EKO, PLQ, P).
3. Set the thermostat to the maximum operation temperature.
4. Light the burner following the instructions on the internal side of the door (see more details in
the instructions EKO, PLQ, P).
5. Turn the boiler’s main switch on. The control light goes on and the main burner is ignited. Set
the thermostat back to the required temperature of the heating water.
6. To put the boiler out of operation for a short time, turn the main switch off and thereby, the
boiler remains in the stand-by mode, disconnected from power supply.
7. To put the boiler out of operation for a long time, turn the combined valve into the „off“ posi-
tion (see instruction EKO, PLQ, P), close the manual gas valve and put the power supply flex out
of the socket 230 V/50 Hz.
8. If it comes to the power failure during the operation, the gas supply into the burner is inter-
rupted, while the burner still burns (EKO, PLQ, P). When the power is supplied again, the burners
burn automatically without need of intervention.
9. For PLQ and KLQ modifications, the excessive output can be reduced by switching a button on
the front board. The excessive output is reduced automatically by the E and EZ modifications.
10. All the repairs during the guarantee and post-guarantee period have to be done by an author-
ized service organization.
ATTACK, s.r.o.
Vrútky
| 3
CAST IRON FLOOR STANDING GAS BOILER
Contents
Putting the boiler into operation ....................................................................................................................................................... 2
Introduction ................................................................................................................................................................................................ 4
General description ................................................................................................................................................................................. 4
Purpose of use ............................................................................................................................................................................................ 4
Modifications of the cast iron gas boilers ....................................................................................................................................... 5
Conditions of installation ...................................................................................................................................................................... 5
Conditions of operation ......................................................................................................................................................................... 6
Safety conditions ...................................................................................................................................................................................... 7
Examples of classification of the building materials by the inflammable level ................................................................ 7
Conditions to keep the ecological parameters ............................................................................................................................. 7
Technical description EKO, PLQ, KLV, KLQ, E, EZ, P types ........................................................................................................... 7
Electrical front panel of the EKO, PLQ, KLV, KLQ, E boilers ........................................................................................................ 8
Electrical front panel of the EZ boilers ............................................................................................................................................. 8
External dimensions of the EKO, KLV, PLQ, KLQ, P boilers ......................................................................................................... 9
Main parts of EKO, KLV, PLQ, KLQ, P boilers .................................................................................................................................... 9
External dimensions of E, EZ boilers .............................................................................................................................................. 10
Main parts of E, EZ boilers .................................................................................................................................................................. 10
Connecting the boiler to the electricity mains (not for ATTACK P boilers) ....................................................................... 11
Electrical equipment of boilers ......................................................................................................................................................... 11
Start – putting the boiler into operation ....................................................................................................................................... 11
Stop – putting the boiler out of operation .................................................................................................................................. 12
Operation control .................................................................................................................................................................................. 12
Failure states of operation .................................................................................................................................................................. 13
What to do in the case of failure ...................................................................................................................................................... 13
Chimney draught breaker .................................................................................................................................................................. 14
Function of the draught breaker ..................................................................................................................................................... 14
Function of the flue gas thermostat ............................................................................................................................................... 14
Boiler function ........................................................................................................................................................................................ 14
Output regulation ................................................................................................................................................................................. 14
After set up ............................................................................................................................................................................................... 15
Regulation of operation ...................................................................................................................................................................... 15
Marking of the boiler ............................................................................................................................................................................ 15
Spare parts ............................................................................................................................................................................................... 15
Guarantee, claim .................................................................................................................................................................................... 16
Service ........................................................................................................................................................................................................ 16
Maintenance ............................................................................................................................................................................................ 16
Packaging, transport, storing ............................................................................................................................................................ 16
Boiler accessories and documentation ......................................................................................................................................... 16
Technical changes ................................................................................................................................................................................. 16
Conclusion ................................................................................................................................................................................................ 17
Setting of the modulation electronics of the ATTACK EZ boiler ......................................................................................... 17
Technical data ......................................................................................................................................................................................... 18
Connecting the electrical installation of the ATTACK EKO boiler ....................................................................................... 19
Connecting the electrical installation of the ATTACK KLV boiler ........................................................................................ 19
Connecting the electrical installation of the ATTACK PLQ boiler ........................................................................................ 20
Connecting the electrical installation of the ATTACK KLQ boiler ....................................................................................... 20
Connecting the electrical installation of the ATTACK EZ boiler ........................................................................................... 21
Connecting the electrical installation of the ATTACK E boiler ............................................................................................. 21
Specyfikacje produktu
Marka: | ATTACK |
Kategoria: | Bojler |
Model: | KLV |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z ATTACK KLV, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Bojler ATTACK
17 Grudnia 2024
17 Grudnia 2024
17 Grudnia 2024
17 Grudnia 2024
15 Grudnia 2024
Instrukcje Bojler
- Bojler AEG
- Bojler Morco
- Bojler Bosch
- Bojler Siemens
- Bojler Remeha
- Bojler Truma
- Bojler Buderus
- Bojler Thermex
- Bojler Viessmann
- Bojler Vaillant
- Bojler Atag
- Bojler Inventum
- Bojler Junkers
- Bojler ACV
- Bojler De Dietrich
- Bojler Wijas
- Bojler Nefit
- Bojler A.O. Smith
- Bojler Agpo Ferroli
- Bojler Ariston
- Bojler Eldom
- Bojler Stiebel Eltron
- Bojler Elco
- Bojler Itho-Daalderop
- Bojler Saunier Duval
- Bojler TTulpe
- Bojler Atlantic
- Bojler Bulex
- Bojler AWB
- Bojler Quooker
- Bojler Daalderop
- Bojler Eccotemp
- Bojler Thermor
- Bojler LEMET
- Bojler Oertli
- Bojler Wesen
- Bojler Benekov
- Bojler Worcester-Bosch
- Bojler Elson
- Bojler Lochinvar
- Bojler Eco Heating Systems
- Bojler MTS
- Bojler Strom
- Bojler Moa
- Bojler Schafer Heiztechnik
- Bojler Thermona
Najnowsze instrukcje dla Bojler
15 Stycznia 2025
15 Stycznia 2025
15 Stycznia 2025
14 Stycznia 2025
14 Stycznia 2025
14 Stycznia 2025
14 Października 2024
28 Września 2024
28 Września 2024
28 Września 2024