Instrukcja obsługi ATen PE7324G
ATen
Listwa zasilająca
PE7324G
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla ATen PE7324G (84 stron) w kategorii Listwa zasilająca. Ta instrukcja była pomocna dla 5 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek
Strona 1/84
eco PDU PE Series
PE7216 / PE7324 / PE8216 / PE8324
Power Distribution Unit
User Manual
www.aten.com
eco PDU PE Series User Manual
ii
FCC, CE Information
FEDERAL COMMUNICATIONS COMMISSION INTERFERENCE
STATEMENT: This equipment has been tested and found to comply with the
limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These
limits are designed to provide reasonable protection against harmful
interference when the equipment is operated in a commercial environment.
This equipment generates, uses, and can radiate radio frequency energy and, if
not installed and used in accordance with the instruction manual, may cause
harmful interference to radio communications. Operation of this equipment in
a residential area is likely to cause harmful interference in which case the user
will be required to correct the interference at his own expense.
FCC Caution: Any changes or modifications not expressly approved by the
party responsible for compliance could void the user's authority to operate this
equipment.
CE Warning: This is a class A product. In a domestic environment this product
may cause radio interference in which case the user may be required to take
adequate measures.
NOTE: The KJ and J model series do not meet or qualify for FCC or CE
certification, as they are produced for countries outside the FCC’s jurisdiction.
RoHS
This product is RoHS compliant.
SJ/T 11364-2006
The following contains information that relates to China.
eco PDU PE Series User Manual
iii
User Information
Online Registration
Be sure to register your product at our online support center:
Telephone Support
For telephone support, call this number:
User Notice
All information, documentation, and specifications contained in this manual are subject
to change without prior notification by the manufacturer. The manufacturer makes no
representations or warranties, either expressed or implied, with respect to the contents
hereof and specifically discla ntability or fitness for any ims any warranties as to mercha
particular purpose. Any of the manufacturer's software described in this manual is sold
or licensed as is. Should the programs prove defective following their purchase, the
buyer (and not the manufacturer, its distributor, or its dealer), assumes the entire cost of
all necessary servicing, repair and any incidental or consequential damages resulting
from any defect in the software.
The manufacturer of this system is not responsible for any radio and/or TV interference
caused by unauthorized modifications to this device. It is the responsibility of the user
to correct such interference.
The manufacturer is not responsible for any damage incurred in the operation of this
system if the correct operational voltage setting was not selected prior to operation.
PLEASE VERIFY THAT THE VOLTAGE SETTING IS CORRECT BEFORE USE.
If any bodily injury or property damage with respect to operation of the product results
from users not having installed the product in accordance with the instructions provided
in the product’s user manual, or the product is used in an environment with a current
load over the designed specifications of the product, ATEN is not liable for any loss or
damage.
International http://eservice.aten.com
International 886-2-8692-6959
China 86-10-5255-0110
Japan 81-3-5615-5811
Korea 82-2-467-6789
North America 1-888-999-ATEN ext 4988
United Kingdom 44-8-4481-58923
Specyfikacje produktu
Marka: | ATen |
Kategoria: | Listwa zasilająca |
Model: | PE7324G |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z ATen PE7324G, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Listwa zasilająca ATen
22 Września 2024
21 Września 2024
21 Września 2024
20 Września 2024
20 Września 2024
20 Września 2024
20 Września 2024
20 Września 2024
18 Września 2024
18 Września 2024
Instrukcje Listwa zasilająca
- Listwa zasilająca Yato
- Listwa zasilająca StarTech.com
- Listwa zasilająca Nedis
- Listwa zasilająca APC
- Listwa zasilająca Tripp Lite
- Listwa zasilająca V7
- Listwa zasilająca Digitus
- Listwa zasilająca EVOline
- Listwa zasilająca Oehlbach
- Listwa zasilająca DataVideo
- Listwa zasilająca Panduit
- Listwa zasilająca Intellinet
- Listwa zasilająca Kindermann
- Listwa zasilająca GoGen
- Listwa zasilająca Oregon Scientific
- Listwa zasilająca Hama
- Listwa zasilająca CyberPower
- Listwa zasilająca Geist
- Listwa zasilająca Brennenstuhl
- Listwa zasilająca Eglo
- Listwa zasilająca Caliber
- Listwa zasilająca Eminent
- Listwa zasilająca Energenie
- Listwa zasilająca Steren
- Listwa zasilająca Ufesa
- Listwa zasilająca Konig
- Listwa zasilająca Panamax
- Listwa zasilająca Furman
- Listwa zasilająca Legrand
- Listwa zasilająca Bachmann
- Listwa zasilająca Kondator
- Listwa zasilająca Bauhn
- Listwa zasilająca Altronix
- Listwa zasilająca Middle Atlantic
Najnowsze instrukcje dla Listwa zasilająca
15 Października 2024
15 Października 2024
9 Października 2024
9 Października 2024
9 Października 2024
7 Października 2024
3 Października 2024
2 Października 2024
2 Października 2024
1 Października 2024