Instrukcja obsługi Tripp Lite EBP240V3502


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Tripp Lite EBP240V3502 (80 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 6 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/80
Owner’s Manual
Extended-Run Battery Cabinet
Not suitable for mobile applications.
BP192V787C-1PH (Single-Phase),
BP480V200 and All BP240V Models
BP480V300 and BP480V400 Models BP480V500 Model
1111 W. 35th Street, Chicago, IL 60609 USA • www.tripplite.com/support
Copyright © 2019 Tripp Lite. All trademarks are the sole property of their respective owners.
2
1. Table of Contents
1. Introduction 3
2. Important Safety Instructions 4
3. Battery Cabinet Installation 6
3.1 Preparation 6
3.2 Transportation 6
3.3 Mechanical Check 6
3.4 Internal Wiring (Typical) 7
3.5 Preliminary Electrical Check 7
3.6 Battery Cabinet Placement 7
3.7 Electrical Connection 8
3.8 Battery Charger Electrical Connection 8
(Select Models)
3.9 Final Electrical Check 8
4. Operation and Charging 9
4.1 Determine Charging Voltages 9
4.2 Initial Charge 9
4.3 Operational Check 9
4.4 Acceptance Test (Optional) 9
5. Maintenance 10
5.1 Maintenance Schedule 10
6. Diagrams 11
6.1 Battery Cabinet Diagrams 11
6.1.1 BP192V787C-1PH Model (2 Shelves) 11
6.1.2 All BP240V Models (3 Shelves) 12
6.1.3 BP480V200 Model (4 Shelves) 13
6.1.4 BP480V300 and BP480V400 Models 14
(4 Shelves)
6.1.5 BP480V500 Model (4 Shelves) 15
6.2 Battery and Breaker Diagrams 16
6.2.1 192 VDC (Single-Phase) 16
6.2.2 240 VDC (Single-Phase) 17
6.2.3 240 VDC (3-Phase) 18
6.2.4 +/- 240 VDC (3-Phase) 19
6.2.5 EBP-Series (+/- 120 VDC) 20
6.2.6 Busbar Connections for 21
Multi-Cabinet Systems
6.3 Integrated 7A Battery Charger 23
(Select Models)
7. Specifications 24
7.1 Dimensions and Floor Loading 24
7.2 Recommended Torque 25
8. Storage and Service 26
9. Warranty 26
Español 27
Русский 53
3
1. Introduction
Tripp Lite’s Extended-Run Battery Cabinets connect to SmartOnline® UPS Systems to provide long-lasting battery backup for data centers,
telecommunications, networks, industrial facilities, security, emergency systems and other mission-critical applications that require high
capacity, high availability and extended runtime.
Features
Battery cabinets are available in voltages of 192 VDC, 240 VDC or 480 VDC and capacities from 55 to 140AH @ C20 to 1.67VPC.
Battery cabinets contain multiple 12 VDC batteries connected in series for higher voltages. Multiple battery cabinets may be connected in
parallel for increased runtime.
Depending on the number of individual batteries contained, each battery cabinet will have 2, 3 or 4 shelves with 4, 8, or 10 individual
batteries (maximum) per tier.
Battery cabinets with the seismic option are certied to the 2012 edition of the International Building Code (IBC) and the 2013 edition of
the California Building Code (CBC), to meet IBC and CBC seismic design category F, Ss = 2.0 and importance factor 1.5.
Hinged lockable door to facilitate access to batteries for periodic maintenance.
There is a minimum of 5 inches of clearance above the individual batteries for access to terminals.
Battery cabinet is constructed of heavy gauge welded steel.
Baked powder coat finish provides chip and corrosion resistance.
Battery cabinet is shipped bolted to pallet with a double layer of protective stretch wrap and integrated corner and top protection.
Appropriate ventilation and convection cooling of the individual batteries is provided via spacing between batteries. Front and rear vents
allow the free flow of warmer air out of the battery cabinet.
The internal battery series’ circuits are completely wired.
A molded case circuit breaker is provided for over-current protection (the molded case circuit breaker is fitted with an auxiliary contact).
User-supplied power output cables can be fed into the battery cabinet through built-in conduit knockouts in the top or sides of the cabinet
(gland plate included).
For improved safety, higher power density and minimized maintenance, the cabinet systems use Valve-Regulated Lead-Acid (VRLA)
recombinant batteries. The electrolyte in these batteries is immobilized in either an absorbent mat separator or a gelling medium,
eliminating the spilling hazards and maintenance requirements of free liquid electrolyte. There is no need to add water or measure specific
gravity.
Because the batteries are recombinant cells that employ an oxygen recombination cycle, minimal gasses are emitted during normal float
charging. Each cell contains an individual valve which releases the gas products of overcharge and prevents pressure build-up within the
cell.
Select battery cabinets (single-phase and “C” models) include an integrated battery charger that requires an AC power connection that is
not part of the UPS output.


Specyfikacje produktu

Marka: Tripp Lite
Kategoria: Niesklasyfikowane
Model: EBP240V3502

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Tripp Lite EBP240V3502, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Tripp Lite

Tripp Lite

Tripp Lite B127A-1A1-BDBH Instrukcja

12 Października 2024
Tripp Lite

Tripp Lite BP36V15-2U Instrukcja

9 Października 2024
Tripp Lite

Tripp Lite RBC92-2U Instrukcja

9 Października 2024
Tripp Lite

Tripp Lite SRCOMBO Instrukcja

8 Października 2024
Tripp Lite

Tripp Lite T014-001 Instrukcja

7 Października 2024
Tripp Lite

Tripp Lite RBC7A Instrukcja

7 Października 2024
Tripp Lite

Tripp Lite N250-P12 Instrukcja

7 Października 2024
Tripp Lite

Tripp Lite PS410HGUK Instrukcja

6 Października 2024

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

Stihl

Stihl HT 70 Instrukcja

15 Października 2024
Ernesto

Ernesto H14270 Instrukcja

15 Października 2024
Uniden

Uniden BT MIC KIT Instrukcja

15 Października 2024
Vaude

Vaude Omnis Bike 26 Instrukcja

15 Października 2024
ART

ART ProChannel II Instrukcja

15 Października 2024
Aukey

Aukey DR02J Instrukcja

15 Października 2024
Master Lock

Master Lock 653EURD Instrukcja

15 Października 2024
Roland

Roland FR-18 Diatonic Instrukcja

15 Października 2024