Instrukcja obsługi Salicru 698BT000002


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Salicru 698BT000002 (48 stron) w kategorii nieskategoryzowany. Ta instrukcja była pomocna dla 2 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/48
2.1.1. Conventions and used symbols.
3.2.1. First and second environment.
3.2.1.1. First environment.
3.2.1.2. Second environment.
4.1.1. Views of the equipment.
4.1.2. Legends corresponding to the equipments views.
4.2.1. Nomenclature.
4.3.1. Main features.
4.4.1. Isolation transformer.
4.4.2. External maintenance manual bypass.
4.4.3. Integration in IT networks by means of the SNMP adaptor.
4.4.4. Relays interface card.
4.4.5. Parallel cable kit.
4.4.6. MODBUS protocol.
4.4.7. Telescopic guide kit for rack cabinet assembling in.
5.2.1. Unpacking, content checking and inspection.
5.2.2. Storage.
5.2.3. Unpacking.
5.2.4. Procedure to take out and install the batteries in equipments of 4 to
10 kVA.
5.2.5. Vertical -tower type- or rack models.
5.2.5.1. Rotation of control panel with LCD.
5.2.5.2. Taking out or putting the beautiful front cover.
5.2.5.3. Vertical -tower type-assembling.
5.2.5.4. Vertical -tower type- assembling, with extended back up time
(battery module).
5.2.5.5. 19" rack cabinet mounting.
5.2.5.6. 19" rack cabinet assembling, with extended back up time (battery
module).
5.3.1. Connection of input.
5.3.2. Connection of the static bypass power blocks (> 3 kVA models
power rate only).
5.3.3. Connection of the IEC outlets and output power blocks.
5.3.4. Connection of the external batteries (extended back up time).
5.3.5. Connection of main input earth terminal and the earth bonding
terminal .
5.3.6. Terminals for EPO (Emergency Power Off).
5.3.7. "Dry_in" terminals, remote ON-OFF (0,7 to 3 kVA equipments only).
5.3.8. "Dry_out" terminals, dry contact for alarm (0,7 to 3 kVA equipments
only).
5.3.9. Connection in parallel.
5.3.9.1. Introduction to the redundancy.
5.3.9.2. Installation and parallel operating (4 to 10 kVA equipments only).
5.3.10. Communication ports.
5.3.10.1. RS232 and USB interfaces.
5.3.10.2. Smart slot.
5.3.10.3. Relays interface (option).
5.3.11. Software.
5.3.12. Considerations before starting up the connected loads.
6.1.1. Controls before commissioning.
6.2.1. Start up and shutdown of the UPS.
6.2.2. Start up of the UPS, without mains.
6.2.3. UPS shutdown, with mains present.
6.2.4. UPS shutdown, without mains.
6.5.1. Operating principle.
6.5.2. Transference to maintenance bypass.
6.5.3. Transference to normal mode.
7.1.1. Acoustic alarms.
7.1.2. UPS status and color LCD display, as condition.
7.1.3. Main screen.
7.3.1. Main screen.
7.3.2. UPS status submenu.
7.3.3. Data logger submenu.
7.3.4. Measurement submenu.
7.3.5. Control submenu.
7.3.6. Identification submenu.
7.3.7. Setting submenu.
7.4.1. Operating on ECO mode.
7.4.1.1. Short description of the ECO mode.
7.4.1.2. To establish the ECO mode function.
7.5.1.1. Short description of the frequency converter function.
7.5.1.2. To establish the Converter mode function.
8.1.1. Notes for installing and replacing the batteries.
8.2.1. Troubleshooting guide. Alarm or fault indications.
8.2.2. Troubleshooting guide. Warning indications.
8.2.3. Troubleshooting guide. Other circumstances.
8.3.1. Warranty terms.
8.3.2. Out of scope of supply.


Specyfikacje produktu

Marka: Salicru
Kategoria: nieskategoryzowany
Model: 698BT000002
Kolor produktu: Czarny
Ilość: 1
Technologia baterii: Ołowiany (VRLA)
Układ: Rackmount/Tower
Napięcie baterii: 12 V
Obsługiwane produkty: Salicru SLC-1500-TWIN RT

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Salicru 698BT000002, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje nieskategoryzowany Salicru

Instrukcje nieskategoryzowany

Najnowsze instrukcje dla nieskategoryzowany

Asko

Asko DBI644MIB.S.TW/1 Instrukcja

28 Października 2024
Asko

Asko DFS233IB.S.TW/1 Instrukcja

28 Października 2024
Emko

Emko EZM-9920 Instrukcja

27 Października 2024
Emko

Emko ESM-3712-H Instrukcja

27 Października 2024
Emko

Emko ATS-10 Instrukcja

27 Października 2024
Emko

Emko EAOM-11.2 Instrukcja

27 Października 2024
Emko

Emko EPM-3790 Instrukcja

27 Października 2024
Emko

Emko EPM-7790 Instrukcja

27 Października 2024
Livarno Lux

Livarno Lux IAN 108340 Instrukcja

27 Października 2024
Livarno Lux

Livarno Lux HG06009A-BS Instrukcja

27 Października 2024