Instrukcja obsługi Panduit PRV679


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Panduit PRV679 (4 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 2 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/4
INSTALLATION INSTRUCTIONS CM293K
© Panduit Corp. 2010
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
DUAL HINGED SINGLE HINGED
Single Sided Dual Sided DOORS DOORS
PRV15 PRVF15 PRD15
PRV12 PRVF12 PRD12 PRSHD12
PRV10 PRVF10 PRD10
PRV8 PRVF8 PRD8 PRSHD8
PRV6 PRVF6 PRD6 PRSHD6
All PatchRunner Managers and Dual Hinged Doors are available in 96" tall versions
6 inch and 12 inch wide PatchRunner Managers and Dual Hinged Doors are also available in
(PRV**96, PRVF**96, and PRD**96) **= 6,8,10,12,or 15 inch wide
VERTICAL CABLE MANAGEMENT
79" tall versions (PRV679, PRVF679, PRD679, PRV1279, PRVF1279, PRV1279)
Recommended bolt placement for mounting
manager to rack channel.
Middle Location
Bolt
(For Front Only Manager
& Front & Rear Manager)
Top Location
Bolt
(For Front Only & Front & Rear
Manager)
Bottom Location
Bolt and Spacer
(For Front Only Manager)
Bolt
(For Front & Rear Manager)
(1) P R ATCH UNNER Vertical Cable Manager
(6) 1/2-13 Hex Nuts
(6) 1/2-13x2.0” Bolts
(12) Washers for 1/2-13 bolts
(4) Spools
(2) .91 long 1/2-13 Bolt Spacers
* Spools sold separately for PRV6 & PRVF6
Page 1 of 4
P R ATCH UNNER Vertical Cable Manager
LOCATION GUIDE - STANDARD EIA RACK
CONTENTS
After the first rack is mounted to the floor with the
appropriate hardware, Use Three 1/2-13x2.0” bolts
(supplied with the vertical cable manager panels) to
fasten the PATCHRUNNER Vertical Cable Manager
to the rack. Next, mount the second rack to the
other side of the PATCHRUNNER Vertical Cable
Manager using the remaining 1/2-13x2.0” bolts. Then
mount the second rack to the floor using the appropriate
hardware.
Center Mounting of a P RATCH UNNER on Standard EIA Rack
Spacer
Note:
Tighten bolts to 120 lbs.-in.
Signifies Bottom
6” Vertical Manager dimension shown in brackets [...]
8” Vertical Manager dimensions shown in parenthesis (...)
10” Vertical Manager dimensions shown in asterisk *...*
15 “Vertical Manager dimensions shown in brackets {...}
PART NUMBERS
INSTALLATION INSTRUCTIONS CM293K
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 2 of 4
INSTALLATION OF SPOOLS
Step 1
Align buttons with mounting leg slot
Mounting Face
Step 2
Push buttons through backbone until
mounting face is flush with backbone.
Step 3
Apply downward pressure until plastic
spool clicks into place.
Removal/Replacement
Step 4
Pull back on angled flange while apply-
ing upward pressure
Step 5
Repeat steps 1-3
Angled Flange
Mounting Leg Slots
DUAL HINGED DOOR BRACKET INSTALLATION
Attach cross braces with #10-32 screws to door bracket as shown in
picture below. Align angled notch on cross brace with angled notch
on door bracket when tightening screws.
(4) Screws
Cross Brace
Door Bracket Angled Notches
FINGER REMOVAL
Apply inward pressure at finger ends to remove finger
Score Groove
INSTALLATION INSTRUCTIONS CM293K
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 3 of 4
DUAL HINGED DOOR INSTALLATION
Align lower pins with lower hinge pin mounting holes. Squeeze
release knobs together, then align upper door pins with upper hinge
pin mounting holes. Release pressure on the release knobs to set
door in place.
Release Knobs
Door
Upper Door Pin
Upper Hinge Pin Mounting Hole
Lower
Hinge Pin
Mounting Hole
Lower Door Pin
SINGLE HINGED DOOR INSTALLATION
Align lower door pin with lower hinge pin mounting hole. Then
align upper door pin with upper hinge pin mounting hole pull down
on pin and insert it into the mounting hole.Door can be hinged to
the right or left by reversing top and bottom.
Upper Hinge Pin
Lower Hinge Pin
Upper Hinge Pin Mounting Hole
Lower
Hinge Pin
Mounting Hole
Door
Magnet Stop
Door Bracket installs in
the same fashion as the
Dual Hinge Bracket
Route cables through fingers of P -ATCH
RUNNER Vertical Manager maintaining
cable bend radii. Use a slot on the PATCH-
RUNNER Vertical Cable Manager that is the
same height as the patch panel. Proper
routing for angled patch panel and flat
patch panel shown below.
Angled Patch Panel Detail Flat Patch Panel Detail
Patch Panels Through
PATCHRUNNER Vertical Cable Manager
ROUTING CABLE
Note: For cleaning PANDUIT recommends using ‘SIMPLE GREEN’ all
purpose cleaner (or local equivalent) and a lint free cloth
Note: For cleaning P SANDUIT recommends using IMPLE GREEN’ all
purpose cleaner (or local equivalent) and a lint free cloth


Specyfikacje produktu

Marka: Panduit
Kategoria: Niesklasyfikowane
Model: PRV679

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Panduit PRV679, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Panduit

Panduit

Panduit XG-ADS7B Instrukcja

9 Października 2024
Panduit

Panduit XG-ADS6B Instrukcja

9 Października 2024
Panduit

Panduit FHS9N-12-3AR Instrukcja

7 Października 2024
Panduit

Panduit PPTEH Instrukcja

1 Października 2024
Panduit

Panduit KPTSTL Instrukcja

1 Października 2024
Panduit

Panduit PTS Instrukcja

1 Października 2024
Panduit

Panduit PTH Instrukcja

1 Października 2024
Panduit

Panduit CD-720 Instrukcja

22 Września 2024
Panduit

Panduit PBTMT-HEAD Instrukcja

22 Września 2024

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

Stihl

Stihl HT 70 Instrukcja

15 Października 2024
Ernesto

Ernesto H14270 Instrukcja

15 Października 2024
Uniden

Uniden BT MIC KIT Instrukcja

15 Października 2024
Vaude

Vaude Omnis Bike 26 Instrukcja

15 Października 2024
ART

ART ProChannel II Instrukcja

15 Października 2024
Aukey

Aukey DR02J Instrukcja

15 Października 2024
Master Lock

Master Lock 653EURD Instrukcja

15 Października 2024
Roland

Roland FR-18 Diatonic Instrukcja

15 Października 2024