Instrukcja obsługi Growatt MOD 12KTL3-X

Growatt Niesklasyfikowane MOD 12KTL3-X

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Growatt MOD 12KTL3-X (3 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 2 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/3
1 2 3 4 5 6 7 8 11 12109
MOD 3-15KTL3-X Quick Guide
452.2
171.8 87.4
391.5
213
141
2 3. Communication module installation
Inverter side
Inverter side Inverter side
Inverter side
Up
UninstallInstall
3
3
3
33.
.
.
..
Electri cal connection
Please prepare the cable before connecting as follows.
1
2
3
4
Cable name
PV input wire
Type
Two or three polychromatic
multi-core copper wires
PV wire such as PV1 F - )
RS485
Recommend model
6mm²
6mm²
4mm² - 6mm²
/
No.
AC output wire
grounding wire
Protective Single multi-core
yellow-green wire 1.Please make sure all switches are in “OFF
position before wiring. For personal safety,
please do not operate with electricity.
2.If the diameter of the cable does not match
the terminal, or the cable is aluminum wire,
please contact our after-sales personnel.
Note:
3 1. Grounding 3 2 .AC output connection
3 3. DC connection
3.3.1 PV input terminal installation
System overview 2.1 Installation requirements
2.2 Wall mounting
Note
1.When drilling holes in the wall, avoid water and electricity pipes, otherwise it may cause danger.
1
1
1
11.
.
.
..
2
2
2
22.
.
.
..
(1)Front panel (2)Touch button (3)LCD screen (4)LED indicator ( )5 Mounting bracket
( )6 Heat sink ( )7 DC switch ( )8 PV terminal ( ) ( )9 RS485 port 10 USB port
( ) ( )11 Vent valve 12 AC terminal
1. , .This document is for quick installation guidance only please refer to User Manual for more details
2. .Growatt shall not be liable for any damage resulting from unproper installation
Note
Note
Overview
Installation
300mm
300mm
300mm
300mm
300mm
186.4
178.4
123
4 5
Dual MPPTs for MOD 3-11KTL3-X,one string input per MPPT.Dual MPPTs for MOD 12-15KTL3-X & MOD 7-11KTL3-X-AU,one MPPT
has one string,and other one has two strings.
Communication
wire
8 10mm-
123
45
4mm² - 6m
4mm² - 6m
Positiv e metal terminal
Positiv e metal terminal
Negative metal terminal
Negative metal terminal
Negative metal terminal
Please make sure the cable can not be
pulled out after pressing.
Pull the PV cable make sure there
is no loos or s haking.
Make sure the cable polarity is
correct and voltage is less than
1100V.
GR UM 204 A 02- - - -
PV+
PV-
12
Customer can read more information by push button.
Mark
Describe
Explain
Touch mark
Single touch
Switch the display interface or the
current number plus 1
Double touch
Enter the setting state or confirm
Triple touch
Return to the previous display
interface
Long press for 5s
The current data returns to the
default value
Inverter status indicator
Red
Fault
Green
Normal operation
Red light flashing
Warning
It can display the basic information of inverter through LCD display
screen (PV/AC voltage,PV power,AC current,total power,generating
capacity, etc.).
Shenzhen Growatt New Energy CO.,LTD
No.28 Guangming Road, Shiyan Street, Bao’an District,
Shenzhen, P.R.China
+86 0755 2747 1942
www.ginverter.com
T
E service@ginverter.com
W
7
7
7
77.
.
.
.. Status of PV grid inverter
9
9
9
99.
.
.
..
Service and contact
Note:
1.Before installing the PV terminal, please
double-check that the PV input voltage and
current do not exceed the MPPT limits.
2.When installing the PV terminal, pay
attention to the difference between the
positive and negative poles and the one-to-
one correspondence between the terminals
and the machine.
3.There is a "click" sound when the terminal
is connected,please gently pulling the PV
wire to make sure there is no loose or
pulling off.
3.3.3 Communication cable installation
Inverter side
Click
5
5
5
55.
.
.
..
Post-installation check
No.
Acceptance criteria
No.
Acceptance criteria
1
The inverter is installed correctly, firmly and reliably.
6
The RS485 communication cable is installed correctly and firmly.
2
The ground wire connected well and the connection is firm
and reliable.
7
The cable tie port is trimmed well without leaving sharp
corners,meets the requirements of the user.
3
All switches are in the OFF state.
8
All exposed terminals are well protected and there are no vacant
ports.
4
All wiring is correct and securely connected.
9
Pay attention to clean up all construction residues.
5
The wiring of the cable is reasonable, meets the
requirements, and there is no phenomenon of broken skin.
Download
Manual Growatt New Energy
3.3.2 Plug in PV terminal
Click!
Click!
Description
Remarks
+12V
Dry junction : external
relay coil interface,
power is not more than
2W
COM
RS485A1
RS485 communication
port
RS485B1
RS485A2
BAT communication
port(reserved)
RS485B2
RS485A3
Meter communication
port
RS485B3
DRM1/5
Relay contact 1 input
DRM2/6
Relay contact 2 input
DRM3/7
Relay contact 3 input
DRM4/8
Relay contact 4 input
REF/GEN
GND
DRM0/COM
/
No.
RRCR
Description
Active
Power
9
K1-out
0%
10
K2-out
30%
11
K3-out
60%
12
K4-out
100%
13
Relays
common node
/
14
/
/
When connecting the communication line,port 15 and 16 are not connected,as for the other function,please refer to the above table
according to the customer needs.
Note
connect
to RRCR
Connecting Meter
4
4
4
44.
.
.
..
The following table describes how we can connect EASTRON meter (TPM-E)to inverter:
Meter Pin NO. Description Meter Connection
1/2/3/4
5/6/7/8
A
B
L1/L2/L3/N-in
L1/L2/L3/
N-out
RS485A
RS485B
Grid L1/L2/L3/N
AC connector & Load L1/L2/L3/N
SYS COM Pin 7 RS485A2
SYS COM Pin 8 RS485B2
Before turning the inverter on, please make sure the PV input voltage and current are within the MPPT limits.
Follow the steps below to turn the inverter on:
1.Switch on the build-in DC isolator at the bottom of the inverter.
2.Switch on the PV Array and DC isolator next to your inverter, if you can not find this switch, skip this step.
3.Switch on the Solar AC isolator if the inverter is more than 3 meters away from your switchboard.
4.Switch on the solar supply main switch in the switch board.
To shut down your system, follow this guide in reverse order.
Note:
6
6
6
66.
.
.
..
Power on and off steps
8
8
8
88.
.
.
..
Export limitation setting
Exporlimit
OFF ON
Password
123
Set parameter
General
Advanced
Meter
CT
ExportLimit Rate
XXX.X%
Set OK
If the local grid company requires to limit the
output power from your inverter systems,we
introduce the concept of Export Limit Rate.The
ratio of your system output power divided by
the rated power of the inverter is called Export
Limited Rate.For example,if the local grid
companyonly accepts 4kW from your 5kW
system,then the Export Limit Rate of 5kW
inverter should be 80%.
L1
L2
L3
N
L1
L2
L3
N
1
2
3
4
L1
L2
L3
N
5
6
7
8
B A


Specyfikacje produktu

Marka: Growatt
Kategoria: Niesklasyfikowane
Model: MOD 12KTL3-X

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Growatt MOD 12KTL3-X, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Growatt

Growatt

Growatt MOD 3-10KTL3-XA Instrukcja

9 Października 2024
Growatt

Growatt SPF6000ES PLUS Instrukcja

9 Października 2024
Growatt

Growatt SPI 3000-22000 Instrukcja

9 Października 2024
Growatt

Growatt MID 17-22KTL3-X Instrukcja

9 Października 2024
Growatt

Growatt Shine GPRS-F Instrukcja

9 Października 2024
Growatt

Growatt SEM-E Instrukcja

8 Października 2024
Growatt

Growatt Shine WiFi Instrukcja

8 Października 2024
Growatt

Growatt MID 17-40KTL3-X Instrukcja

8 Października 2024

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

Stihl

Stihl HT 70 Instrukcja

15 Października 2024
Ernesto

Ernesto H14270 Instrukcja

15 Października 2024
Uniden

Uniden BT MIC KIT Instrukcja

15 Października 2024
Vaude

Vaude Omnis Bike 26 Instrukcja

15 Października 2024
ART

ART ProChannel II Instrukcja

15 Października 2024
Aukey

Aukey DR02J Instrukcja

15 Października 2024
Master Lock

Master Lock 653EURD Instrukcja

15 Października 2024
Roland

Roland FR-18 Diatonic Instrukcja

15 Października 2024