Instrukcja obsługi Dell Brocade 6510

Dell nieskategoryzowany Brocade 6510

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Dell Brocade 6510 (24 stron) w kategorii nieskategoryzowany. Ta instrukcja była pomocna dla 27 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek

Strona 1/24
Brocade 6510 QuickStart Guide
Complete the steps in this guide to install and set up your Brocade 6510 switch in a single-switch configuration using
EZSwitchSetup. See the Brocade 6510 Hardware Reference Manual Fabric OS Administrator’s Guide and the (located on the
Brocade Family Documentation CD ) if you want to choose a different setup.
Ensure at th you have the it listed b ow. Write down the IP etwor va i h p e pro ded.ems el n k lues n t e s ac vi
Getting Ready
Fi IP ad essxed dr (IPv IPv6) for4 or the sw h (no DHCP server): __________________________________________________itc
Subnet mask value: ______________________________________________________________________________________
Default Gateway value: ___________________________________________________________________________________
Brocade switch World Wide Name (WWN): located on the switch ID pullout: ________________________________________
Ethernet connection (hub or switch) Ethernet and Fibre Channel Cables
EZSwitchSetup CD Setup computer
Host computer with an installed HBA Disk array
Standard screw driver Optical transceivers (SFPs)
Browser that allows pop-up windows
1Powering up and connecting cables to the switch
3
Installing and starting EZSwitchSetup
2
1. Insert the EZSwitchSetup CD into the CD-ROM drive of your setup computer. The installer will autostart in about a minute.
2. Follow the EZSwitchSetup directions for installation. Installation will take a few minutes after you click OK.
3. Wait for EZSwitchSetup to start, which should happen automatically after it is installed.
For Windows and Linux instructions, refer to the EZSwitchSetup Administrator’s Guide.
4. On the EZSwitchSetup screen, choose the option that matches your setup configuration:Introduction
Ethernet connection. This option uses the Ethernet LAN connection you will use for running EZSwitchSetup Manager.
Direct connection to the switch with a serial cable.
Most users will find it more convenient to use the Ethernet connection.
5. Click Next. Connect Cables The screen is displayed.
4. Click Next.
If you chose to use the Ethernet connection, the screen is displayed. Enter the switch WWN, followingDiscover Switch
the instructions on the screen. After completing switch discovery, the screen Discover Switch Set Switch IP Address
is displayed.
If you chose to use the serial port connection, the screen is immediately displayed.Set Switch IP Address
The screen shows you the connections you need to make.Connect Cables
1. Connect the power cord to the switch and to a power
source (1). The power and status LEDs display amber then
green. This can take from one to three minutes.
2. Connect the switch and the setup computer to the
same LAN, using Ethernet cables (3, 5) and an Ethernet
hub or switch (2). Be sure the Ethernet hub or switch is
connected to a power source (6).
3. If you want to use a serial connection for setup, connect
your setup computer COM port (7) to the serial port on the
switch, using the serial cable shipped with the switch (4).
The serial connection settings are as follows:
Bits per second: 9600
Databits: 8
Parity: none
Stop bits: 1
Flow control: none
®
1
2
7
5
3
6
4
Setting the switch IP address
4
1. Enter the required information on the Set Switch IP Address screen.
2. If prompted to install Active X or a version of the Java runtime environment, do so. Reboot the setup computer, if required.
3. Click Next.
Confirm IP Address The screen is displayed.
4. Click Next to confirm the addresses.
A screen is displayed.Continue Configuration
5. Click Continue with EZManager.
1. Install the SFP+ transceivers in the Fibre Channel ports on the switch to match the ports shown onscreen.
2. Make the physical connections to your host and storage devices. Match the physical connections shown on the
Configure Ports and Connect Devices screen.
3. The Finish screen will display this message: “Congratulations - you’ve successfully completed the setup!” If you used the
serial connection for setup, you can remove the serial cable.
Additional configuration options, such as custom zoning, are available from EZManager. See the EZSwitchSetup
Administrator’s Guide for more information on custom zoning, and other switch configuration and management options.
Set the switch password
5
1. Click Next on the EZManager Welcome to Switch Configuration screen.
The Set Parameters screen is displayed.
2. Create a new administrator account password in the Set Parameters screen.
3. Enter a new name for the switch (optional step).
4. Adjust the date and time for your time zone (optional step).
5. Click Next.
Configure the zones and perform device selection
6
1. Select Typical Zoning Select Zoning Next.on the screen and click
Typical Zoning is the default zone configuration.
2. Enter the number and types of devices that you are connecting to the switch on the Device Selection screen.
EZSwitchSetup uses these values to automatically configure the ports on your switch.
Connect devices
7
The screen displays a graphical representation of the switch with the device connections based on theConnect Devices
information that you entered when you configured zones and performed device selection. The screen will show all physical
connections as missing until you connect the devices that you specified.
a. The 16 Gbps SFP+ transceivers have a long pull tab and no latching
wire bail. Remove any protector plugs from the SFP+ transceivers you
are going to use, and position and insert each SFP+ transceiver as
required (right side up in the top row of ports and upside down in the
bottom row of ports). Use the pull tab on the 16 Gbps SFP+ tranceivers
to help push the transceiver into the port.
If you are using 16 Gbps SFP+ transceivers, you may want to connect
the cable to the SFP+ first, and then insert them into the port as a unit.
If you are using 8 Gbps SFP+ transceivers, close the latching wire bail.
b. Repeat for the other ports.
a. Remove plastic protector caps from the Fibre Channel cable ends (if any),
and position the cable connector so that it is oriented correctly.
b. Insert the cable connector into the SFP+ until it is firmly seated and
the latching mechanism clicks.
c. The Configure Ports and Connect Devices screen shows missing,
valid, and invalid connections as you cable the switch. Note that it
can take up to 15 seconds for the connection to display as a valid
connection. Verify that the connections are all green and click Next.
®
!
Brocade, the B-wing symbol, BigIron, DCFM, DCX, Fabric OS, FastIron, IronView, NetIron, SAN Health, ServerIron, TurboIron, and Wingspan are registered trademarks,
and Brocade Assurance, Brocade NET Health, Brocade One, Extraordinary Networks, MyBrocade, VCS, and VDX are trademarks of Brocade Communications
Systems, Inc., in the United States and/or in other countries. Other brands, products, or service names mentioned are or may be trademarks or service marks
of their respective owners.
© 2011 Brocade Communications Systems, Inc. All Rights Reserved.
53-10 -0102135
*53-1002135-01*
!
Brocade 6510 QuickStart 指南
完成本指南中的步骤,使用 在单交换机配置中安装和设置 EZSwitchSetup Brocade 6510 交换机。如果您想要选择不同的
设置,请参阅 Brocade 6510 Hardware Reference ManualBrocade 6510 硬件参考手册)和 Fabric OS Administrator’s Guide
管理员指南)(位于 Fabric OS Brocade 系列说明文件光盘上)。
确保您拥有下列项目。在提供的空白处记下 网络值。 IP
准备工作
交换机的固定 地址( )(无 服务器): IP IPv4 IPv6 DHCP __________________________________________________
子网掩码值: ___________________________________________________________________________________________
默认网关值: ___________________________________________________________________________________________
Brocade (WWN) ID ____________________________________________________交换机全球名称 :位于交换机 印签上:
以太网连接(集线器或交换机) 以太网和光纤信道电缆
EZSwitchSetup 光盘 安装计算机
安装有 的主机 磁盘阵列 HBA
普通螺丝刀 光学收发器 (SFP)
允许弹出窗口的浏览器
1启动和连接电缆至交换机
3
安装和启动 EZSwitchSetup
2
1. 将 光盘插入安装计算机的光驱。安装程序会在一分钟内自动开始。 EZSwitchSetup
2. EZSwitchSetup 按照 安装说明进行。在您单击 OK(确定)之后,安装将需要几分钟。
3. EZSwitchSetup 等候 启动,在安装后它应会自动启动。
Windows Linux 有关 说明,请参阅 EZSwitchSetup Administrator’s Guide( 管理员指南)。EZSwitchSetup
4. EZSwitchSetup 在 介绍屏幕,选择与您的安装配置匹配的选项:
以太网连接。此选项使用您将用于运行 的以太网 连接。 EZSwitchSetup Manager LAN
用串行电缆直接连接到交换机
大多数用户会发现,使用以太网连接更方便。
5. 单击 Next(下一步)。显示 Connect Cables(连接电缆)屏幕。
4. 单击 Next(下一步)。
如果您选择了使用以太网连接,显示 (查找交换机)屏幕。按照 (查找交换机) Discover Switch Discover Switch
屏幕上的说明,输入交换机 。完成交换机查找后,显示 (设置交换机 地址)屏幕。 WWN Set Switch IP Address IP
如果您选择了使用串行端口连接, (设置交换机 地址)屏幕随即会显示。Set Switch IP Address IP
Connect Cables(连接电缆)屏幕显示您需要进行的连接。
1. 将电源线连接到交换机和电源 。电源和状态 (1) LED
显示琥珀色,之后显示绿色。这可能需要一到三分钟。
2. (3, 5) (2) 使用以太网电缆 和以太网集线器或交换机
将交换机和安装计算机连接到同一个 。确保以太 LAN
网集线器或交换机已连接到电 (6)
3. 如果您想使用串行连接进行安装,请使用交换机随附
的串行电缆 将安装计算机 端口 连接到交 (4) COM (7)
换机上的串行端口。串行连接设置如下所示:
9600每秒位数:
8数据位:
奇偶校验:无
1停止位:
流控制:无
®
1
2
7
5
3
6
4


Specyfikacje produktu

Marka: Dell
Kategoria: nieskategoryzowany
Model: Brocade 6510
Kolor produktu: Szary
Częstotliwość wejściowa AC: 47/63 Hz
Napięcie wejściowe AC: 85 - 264 V
Wysokość produktu: 43 mm
Szerokość produktu: 438 mm
Głębokość produktu: 443 mm
Waga produktu: 9160 g
Standardy komunikacyjne: IEEE 802.3, IEEE 802.3u
Pełny dupleks: Tak
Obsługa PoE: Nie
Zakres temperatur (eksploatacja): 0 - 40 °C
Zakres wilgotności względnej: 10 - 85 %
Zarządzanie przez stronę www: Tak
Układ: 1U
Liczba portów USB 2.0: 1
Szyfrowanie / bezpieczeństwo: HTTPS, SSH
Zakres temperatur (przechowywanie): -20 - 70 °C
Dopuszczalna wilgotność względna: 10 - 90 %
Liczba wentylatorów: 2 went.
Ilość jednostek zasilania: 2
Obsługa jakość serwisu (QoS): Tak
Protokoły zarządzające: HTTP, SNMP v1/v3
Możliwości montowania w stelażu: Tak
Dopuszczalna wysokość podczas eksploatacji (n.p.m.): -15.2 - 3048 m
Typ przełącznika: Zarządzany
Ilość portów Fast Ethernet (copper): 1
Wielkość tabeli adresów: - wejścia
Przepustowość rutowania/przełączania: 384 Gbit/s
Produkt stackowalny: Nie
Złącze światłowodowe: LC
Raport zdarzeń systemowych: Tak
obsługuje SSH/SSL: Tak
Obsługa zasilania zapasowego (RPS): Tak
Liczba portów: 24
Dopuszczalna wysokość (n.p.m.): -15.2 - 12000 m
Port konsoli: RJ-45
Limit częstotliwości: Tak

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Dell Brocade 6510, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje nieskategoryzowany Dell

Instrukcje nieskategoryzowany

Najnowsze instrukcje dla nieskategoryzowany

Asko

Asko DBI644MIB.S.TW/1 Instrukcja

28 Października 2024
Asko

Asko DFS233IB.S.TW/1 Instrukcja

28 Października 2024
Emko

Emko EZM-9920 Instrukcja

27 Października 2024
Emko

Emko ESM-3712-H Instrukcja

27 Października 2024
Emko

Emko ATS-10 Instrukcja

27 Października 2024
Emko

Emko EAOM-11.2 Instrukcja

27 Października 2024
Emko

Emko EPM-3790 Instrukcja

27 Października 2024
Emko

Emko EPM-7790 Instrukcja

27 Października 2024
Livarno Lux

Livarno Lux IAN 108340 Instrukcja

27 Października 2024
Livarno Lux

Livarno Lux HG06009A-BS Instrukcja

27 Października 2024