Instrukcja obsługi Chief RPAO
Chief
Flat panel steun
RPAO
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Chief RPAO (12 stron) w kategorii Flat panel steun. Ta instrukcja była pomocna dla 3 osób i została oceniona przez 2 użytkowników na średnio 4.5 gwiazdek
Strona 1/12
RPA Series
LCD/DLP
Ceiling Mount
BEFORE YOU BEGIN
• You must have an SLB (bracket designed for your application) to attach the RPA to your projector.
• The maximum weight to be installed on the RPA ceiling mount is 50 pounds (22.68 Kg).
•CAUTION: To prevent damage to the RPA, which could affect or void the Factory warranty, thoroughly
study all instructions and illustrations before you begin to install the RPA. Pay particular attention to the
“Important Precautions” on Page 1.
• If you have any questions about this installation, contact Chief Manufacturing at 1-800-582-6480.
.
I N S T R U C T I O N M A N U A L
The Chief RPA Series ceiling mounts provide a unique, sim-
plified method of ceiling mounting inverted LCD/DLP pro-
jectors. Chief’s low profile design offers three easy
mounting methods (1 1/2”NPT, flush or threaded rod); roll,
pitch and yaw adjustment; a cable management system;
and custom designed brackets that allow quick projector
disconnect without loss of registration.
All Chief RPA Series ceiling mounts provide access for
quick lamp changes and easy filter cleaning without requir-
ing any disassembly. The mount is constructed of heavy
gauge steel and designed to ensure proper projector venti-
lation.
Fast and precise image registration is achieved through the
easy roll, pitch and yaw adjustments built into the RPA
mounts. Optional projector security is included by using the
All-Points™ Security kit
CHIEF MANUFACTURING INC.
1-800-582-6480 952-894-6280 FAX 952-894-6918
12800 HIGHWAY 13 SOUTH, SUITE 500
SAVAGE, MINNESOTA 55378 USA
PART NO. 8811-000001 (Rev. E)
2000 Chief Manufacturing
www.chiefmfg.com
Printed in USA 09-03
RPA
SLB
Typical Shown
All-Points™ Security Option Included
quick-disconnect thumbnut
Chief’s Exclusive
2
Instruction Manual RPA
IMPORTANT WARNINGS AND CAUTIONS!
WARNING: A WARNING alerts you to the possibility of serious injury or death if you do not follow the instructions.
CAUTION: A CAUTION alerts you to the possibility of damage or destruction of equipment if you do not follow the cor-
responding instructions.
•WARNING: Improper installation can result in serious personal injury! Make sure that the ceiling struc-
tural members can support a redundant weight factor five times the total weight of the equipment. If the
ceiling can not support this weight, reinforce the ceiling before installing the RPA.
•CAUTION: Inspect the unit for shipping damage. See “DIMENSIONAL DRAWING” on page 3
TOOLS REQUIRED FOR INSTALLATION
• Allen Wrench (provided)
• Security Allen Wrench (provided)
• Phillips screwdrivers, No. 1 and No. 2
NOTE: Other tools may be required depending on the
method of installation.
CONTENTS
DIMENSIONAL DRAWING ............................. 3
INSPECT THE UNIT BEFORE
INSTALLING ...................................................... 4
PREPARE THE CEILING .................................. 4
General Guidelines ............................................... 4
RPA INSTALLATION PROCEDURES ............. 5
1 1/2” Diameter NPT Threaded Pipe ................... 5
Standard Fasteners Secured to
a Wood Framing Member .................................... 6
Threaded Rod ....................................................... 6
BRACKET ATTACHMENT PROCEDURES ... 7
ALL-POINTS SECURITY .................................. 7
PROJECTOR ALIGMNMENT
INSTRUCTIONS ................................................. 8
Pitch ..................................................................... 8
Roll ....................................................................... 8
Yaw ...................................................................... 8
PARTS ................................................................. 9
Specyfikacje produktu
Marka: | Chief |
Kategoria: | Flat panel steun |
Model: | RPAO |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Chief RPAO, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Flat panel steun Chief
19 Września 2024
19 Września 2024
19 Września 2024
19 Września 2024
19 Września 2024
19 Września 2024
19 Września 2024
19 Września 2024
19 Września 2024
19 Września 2024
Instrukcje Flat panel steun
- Flat panel steun Iiyama
- Flat panel steun HP
- Flat panel steun Icy Box
- Flat panel steun Pyle
- Flat panel steun NEC
- Flat panel steun Vogel's
- Flat panel steun 3M
- Flat panel steun Hitachi
- Flat panel steun Newstar
- Flat panel steun Reflecta
- Flat panel steun Techly
- Flat panel steun Da-Lite
- Flat panel steun Luxor
- Flat panel steun Barkan
- Flat panel steun Atlantic
- Flat panel steun Konig
- Flat panel steun HQ
- Flat panel steun BakkerElkhuizen
- Flat panel steun Peerless
- Flat panel steun SMS Smart Media Solutions
- Flat panel steun Atdec
- Flat panel steun Premier Mounts
- Flat panel steun Cabstone
Najnowsze instrukcje dla Flat panel steun
19 Września 2024
18 Września 2024
18 Września 2024
18 Września 2024
18 Września 2024
18 Września 2024
18 Września 2024
17 Września 2024
16 Września 2024
16 Września 2024